Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
382
matching recommendationsSIC | 3492 | Fluid Power Valves & Hose Fittings |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0108 # 08 Y:1995 | 08 | 1995 | CONVERT TO AQUEOUS CLEANING SYSTEM | $36,907 | $18,000 | Implemented |
AR0044 # 01 Y:1994 | 01 | 1994 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,019 | $565 | Implemented |
AR0044 # 02 Y:1994 | 02 | 1994 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $588 | $385 | Implemented |
AR0044 # 03 Y:1994 | 03 | 1994 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $278 | $100 | Implemented |
AR0044 # 04 Y:1994 | 04 | 1994 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $559 | $100 | Implemented |
AR0044 # 05 Y:1994 | 05 | 1994 | INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS | $196 | $20 | Implemented |
AR0028 # 01 Y:1994 | 01 | 1994 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,571 | $300 | Implemented |
AR0028 # 02 Y:1994 | 02 | 1994 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,490 | $7,600 | Implemented |
AR0028 # 03 Y:1994 | 03 | 1994 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,584 | $913 | Implemented |
AR0028 # 04 Y:1994 | 04 | 1994 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,367 | $495 | Implemented |
AR0028 # 05 Y:1994 | 05 | 1994 | REPLACE ELECTRIC MOTOR WITH FOSSIL FUEL ENGINE | $37,510 | $30,000 | Not Implemented |
AR0028 # 06 Y:1994 | 06 | 1994 | AIR CONDITION ONLY SPACE NECESSARY | $2,792 | $1,000 | Implemented |
NC0012 # 01 Y:1993 | 01 | 1993 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $14,358 | $14,233 | Not Implemented |
NC0012 # 02 Y:1993 | 02 | 1993 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $27,321 | $0 | Not Implemented |
NC0012 # 03 Y:1993 | 03 | 1993 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $2,032 | $4,500 | Implemented |
NC0012 # 04 Y:1993 | 04 | 1993 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,829 | $510 | Implemented |
NC0012 # 05 Y:1993 | 05 | 1993 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $10,454 | $500 | Implemented |
WI0179 # 08 Y:1993 | 08 | 1993 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $158 | $640 | Not Implemented |
WI0179 # 07 Y:1993 | 07 | 1993 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $625 | $700 | Implemented |
WI0179 # 06 Y:1993 | 06 | 1993 | CONSIDER THREE OR FOUR DAYS AROUND-THE-CLOCK OPERATION RATHER THAN ONE OR TWO SHIFTS PER DAY | $736 | $0 | Not Implemented |
WI0179 # 05 Y:1993 | 05 | 1993 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $776 | $500 | Not Implemented |
WI0179 # 04 Y:1993 | 04 | 1993 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $1,354 | $2,800 | Not Implemented |
WI0179 # 03 Y:1993 | 03 | 1993 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,270 | $0 | Implemented |
WI0179 # 02 Y:1993 | 02 | 1993 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,295 | $5,659 | Not Implemented |
WI0179 # 01 Y:1993 | 01 | 1993 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,974 | $4,960 | Not Implemented |