IAC logo
IAC Assessment: AR0028
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AR0028
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Arkansas
Assessment Year 1994
Principal Product Oil and Gas Industry Valves
NAICS n/a
SIC 3492 - Fluid Power Valves & Hose Fittings
Sales $50,000,000-$100,000,000
# of Employees 400
Plant Area (Sq.Ft.) 254,800
Annual Production 20,000 Pieces
Production Hrs. Annual 4,171
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $439,726 6,742,087 kWh $0.07
Natural Gas $55,258 14,316 MMBtu $3.86
TOTAL ENERGY COSTS $494,984
RECOMMENDED SAVINGS* $50,314 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,804
#|Description Savings
Cost
Status Electricity Usage Natural Gas Personnel Changes Electricity Usage Natural Gas Personnel Changes
$ kWh $ MMBtu $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,571
Cost:
$300
$1,571 24,033 - - - - $1,571
24,033
kWh
-
-
MMBtu
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$3,490
Cost:
$7,600
$3,490 53,634 - - - - $3,490
53,634
kWh
-
-
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,584
Cost:
$913
$1,584 24,326 - - - - $1,584
24,326
kWh
-
-
MMBtu
-
-
$
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$3,367
Cost:
$495
$3,367 - - - - - $3,367
-
kWh
-
-
MMBtu
-
-
$
05: 2.4134 REPLACE ELECTRIC MOTOR WITH FOSSIL FUEL ENGINE Savings:
$37,510
Cost:
$30,000
$61,872 948,417 $(-19,362) (-5,016) $(-5,000) - $61,872
948,417
kWh
$(-19,362)
(-5,016)
MMBtu
$(-5,000)
-
$
06: 2.7229 AIR CONDITION ONLY SPACE NECESSARY Savings:
$2,792
Cost:
$1,000
$2,792 42,790 - - - - $2,792
42,790
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$50,314
Cost:
$40,308
$74,676 1,093,200 $(-19,362) (-5,016) $(-5,000) - $74,676
1,093,200
kWh
$(-19,362)
(-5,016)
MMBtu
$(-5,000)
-
$
TOTAL IMPLEMENTED Savings:
$12,804
Cost:
$10,308
$12,804 144,783 - - - - $12,804
144,783
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Personnel Changes Electricity Usage Natural Gas Personnel Changes