Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
148
matching recommendationsSIC | 3493 | Steel Springs, Except Wire |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0142 # 04 Y:2008 | 04 | 2008 | USE RADIANT HEATER FOR SPOT HEATING | $216 | $620 | Not Implemented |
IC0142 # 05 Y:2008 | 05 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,469 | $1,150 | Implemented |
IC0142 # 06 Y:2008 | 06 | 2008 | ELIMINATE COMBUSTIBLE GAS IN FLUE GAS | $2,442 | $0 | Implemented |
IC0142 # 07 Y:2008 | 07 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $525 | $507 | Implemented |
IC0142 # 08 Y:2008 | 08 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $90 | $203 | Implemented |
IC0142 # 09 Y:2008 | 09 | 2008 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $482 | $0 | Not Implemented |
IC0142 # 10 Y:2008 | 10 | 2008 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,501 | $0 | Implemented |
IC0142 # 11 Y:2008 | 11 | 2008 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $734 | $5,429 | Implemented |
IC0142 # 12 Y:2008 | 12 | 2008 | INSTALL OCCUPANCY SENSORS | $711 | $1,402 | Implemented |
IC0142 # 13 Y:2008 | 13 | 2008 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,171 | $0 | Implemented |
IC0142 # 14 Y:2008 | 14 | 2008 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $2,835 | $16,294 | Not Implemented |
IC0142 # 15 Y:2008 | 15 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,846 | $11,800 | Implemented |
SD0344 # 01 Y:2004 | 01 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $42,981 | $35,875 | Implemented |
SD0344 # 02 Y:2004 | 02 | 2004 | ADJUST BURNERS FOR EFFICIENT OPERATION | $6,983 | $7,700 | Not Implemented |
SD0344 # 03 Y:2004 | 03 | 2004 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $8,464 | $27,829 | Not Implemented |
SD0344 # 04 Y:2004 | 04 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,104 | $440 | Implemented |
SD0344 # 05 Y:2004 | 05 | 2004 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $5,399 | $18,500 | Implemented |
LE0141 # 01 Y:2002 | 01 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,396 | $1,000 | Not Implemented |
LE0141 # 02 Y:2002 | 02 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,018 | $0 | Implemented |
LE0141 # 03 Y:2002 | 03 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,005 | $100 | Implemented |
LE0141 # 04 Y:2002 | 04 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,139 | $882 | Implemented |
LE0141 # 05 Y:2002 | 05 | 2002 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,495 | $7,000 | Not Implemented |
LE0141 # 06 Y:2002 | 06 | 2002 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $9,311 | $2,000 | Not Implemented |
LE0141 # 07 Y:2002 | 07 | 2002 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $36,900 | $30,000 | Not Implemented |
MS0202 # 01 Y:2002 | 01 | 2002 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $8,051 | $5,798 | Not Implemented |