IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

148

matching recommendations
Reset
SIC 3493 Steel Springs, Except Wire
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0142 # 04 Y:2008 04 2008 USE RADIANT HEATER FOR SPOT HEATING $216 $620 Not Implemented
IC0142 # 05 Y:2008 05 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,469 $1,150 Implemented
IC0142 # 06 Y:2008 06 2008 ELIMINATE COMBUSTIBLE GAS IN FLUE GAS $2,442 $0 Implemented
IC0142 # 07 Y:2008 07 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $525 $507 Implemented
IC0142 # 08 Y:2008 08 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $90 $203 Implemented
IC0142 # 09 Y:2008 09 2008 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $482 $0 Not Implemented
IC0142 # 10 Y:2008 10 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,501 $0 Implemented
IC0142 # 11 Y:2008 11 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $734 $5,429 Implemented
IC0142 # 12 Y:2008 12 2008 INSTALL OCCUPANCY SENSORS $711 $1,402 Implemented
IC0142 # 13 Y:2008 13 2008 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,171 $0 Implemented
IC0142 # 14 Y:2008 14 2008 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $2,835 $16,294 Not Implemented
IC0142 # 15 Y:2008 15 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,846 $11,800 Implemented
SD0344 # 01 Y:2004 01 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $42,981 $35,875 Implemented
SD0344 # 02 Y:2004 02 2004 ADJUST BURNERS FOR EFFICIENT OPERATION $6,983 $7,700 Not Implemented
SD0344 # 03 Y:2004 03 2004 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $8,464 $27,829 Not Implemented
SD0344 # 04 Y:2004 04 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,104 $440 Implemented
SD0344 # 05 Y:2004 05 2004 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $5,399 $18,500 Implemented
LE0141 # 01 Y:2002 01 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,396 $1,000 Not Implemented
LE0141 # 02 Y:2002 02 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,018 $0 Implemented
LE0141 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,005 $100 Implemented
LE0141 # 04 Y:2002 04 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,139 $882 Implemented
LE0141 # 05 Y:2002 05 2002 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,495 $7,000 Not Implemented
LE0141 # 06 Y:2002 06 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $9,311 $2,000 Not Implemented
LE0141 # 07 Y:2002 07 2002 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $36,900 $30,000 Not Implemented
MS0202 # 01 Y:2002 01 2002 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $8,051 $5,798 Not Implemented