IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

547

matching recommendations
Reset
SIC 3494 Valves And Pipe Fittings, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0074 # 03 Y:1995 03 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $186 $500 Implemented
WV0074 # 04 Y:1995 04 1995 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,929 $2,000 Not Implemented
WV0074 # 05 Y:1995 05 1995 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $360 $689 Not Implemented
AM0250 # 01 Y:1995 01 1995 OPTIMIZE PLANT POWER FACTOR $14,700 $22,050 Not Implemented
AM0250 # 02 Y:1995 02 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,320 $1,580 Implemented
AM0250 # 03 Y:1995 03 1995 INSTALL SKYLIGHTS $900 $470 Implemented
AM0250 # 04 Y:1995 04 1995 INSTALL TIMERS AND/OR THERMOSTATS $890 $280 Not Implemented
AM0250 # 05 Y:1995 05 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $730 $0 Implemented
AM0250 # 06 Y:1995 06 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $690 $610 Implemented
AM0250 # 07 Y:1995 07 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $510 $320 Implemented
AM0250 # 08 Y:1995 08 1995 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $400 $0 Not Implemented
AM0250 # 09 Y:1995 09 1995 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $320 $0 Implemented
NV0027 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,606 $0 Implemented
NV0027 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,365 $615 Implemented
NV0027 # 03 Y:1995 03 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $589 $200 Implemented
NV0027 # 04 Y:1995 04 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,566 $250 Not Implemented
NV0027 # 05 Y:1995 05 1995 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $886 $1,415 Implemented
NV0027 # 06 Y:1995 06 1995 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $605 $112 Not Implemented
NV0027 # 07 Y:1995 07 1995 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $2,845 $1,900 Not Implemented
NC0039 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,241 $2,018 Implemented
NC0039 # 02 Y:1994 02 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,052 $3,850 Not Implemented
NC0039 # 03 Y:1994 03 1994 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $1,432 $1,500 Not Implemented
NC0039 # 04 Y:1994 04 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,710 $600 Not Implemented
NC0039 # 05 Y:1994 05 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,600 $420 Not Implemented
NC0039 # 06 Y:1994 06 1994 RECOVER WASTE HEAT FROM EQUIPMENT $5,307 $2,500 Not Implemented