Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
547
matching recommendationsSIC | 3494 | Valves And Pipe Fittings, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0684 # 06 Y:2015 | 06 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $476 | $1,545 | Not Implemented |
AM0684 # 05 Y:2015 | 05 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,410 | $11 | Not Implemented |
AM0684 # 04 Y:2015 | 04 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,800 | $6,740 | Not Implemented |
AM0684 # 03 Y:2015 | 03 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $14,080 | $2,200 | Not Implemented |
AM0684 # 02 Y:2015 | 02 | 2015 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $14,370 | $0 | Not Implemented |
AM0684 # 01 Y:2015 | 01 | 2015 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $24,700 | $0 | Not Implemented |
UA0140 # 04 Y:2015 | 04 | 2015 | UPGRADE CONTROLS ON COMPRESSORS | $54,259 | $61,169 | Not Implemented |
UA0140 # 01 Y:2015 | 01 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $88,066 | $277,510 | Not Implemented |
UA0140 # 03 Y:2015 | 03 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $20,787 | $1,522 | Implemented |
UA0140 # 02 Y:2015 | 02 | 2015 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $105,613 | $6,000 | Not Implemented |
UA0140 # 05 Y:2015 | 05 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $10,564 | $1,260 | Implemented |
UA0140 # 06 Y:2015 | 06 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,524 | $10,992 | Not Implemented |
OK0852 # 10 Y:2013 | 10 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,935 | $10,793 | Not Implemented |
OK0852 # 02 Y:2013 | 02 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,456 | $0 | Not Implemented |
OK0852 # 06 Y:2013 | 06 | 2013 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $1,139 | $344 | Implemented |
OK0852 # 11 Y:2013 | 11 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,792 | $550 | Implemented |
OK0852 # 09 Y:2013 | 09 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $838 | $3,718 | Implemented |
OK0852 # 03 Y:2013 | 03 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,590 | $2,756 | Not Implemented |
OK0852 # 01 Y:2013 | 01 | 2013 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,621 | $2,310 | Implemented |
OK0852 # 04 Y:2013 | 04 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $497 | $1,388 | Implemented |
OK0852 # 05 Y:2013 | 05 | 2013 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $1,781 | $1,440 | Not Implemented |
OK0852 # 08 Y:2013 | 08 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,138 | $17,292 | Not Implemented |
OK0852 # 07 Y:2013 | 07 | 2013 | INSTALL SET-BACK TIMERS | $1,467 | $1,038 | Not Implemented |
AM0629 # 04 Y:2013 | 04 | 2013 | USE PHOTOCELL CONTROLS | $9,077 | $1,574 | Not Implemented |
AM0629 # 05 Y:2013 | 05 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,548 | $300 | Not Implemented |