Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
20
matching recommendationsSIC | 3494 | Valves And Pipe Fittings, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0115 # 09 Y:1997 | 09 | 1997 | IMPROVE SPACE COMFORT CONDITIONING | $5,760 | $9,150 | Not Implemented |
NC0115 # 08 Y:1997 | 08 | 1997 | REDUCE SOLUTION DRAG-OUT TO PREVENT SOLUTION LOSS | $2,191 | $2,000 | Not Implemented |
NC0115 # 07 Y:1997 | 07 | 1997 | REDUCE SOLUTION DRAG-OUT TO PREVENT SOLUTION LOSS | $391 | $0 | Not Implemented |
NC0115 # 06 Y:1997 | 06 | 1997 | INSTALL / REPAIR INSULATION ON STEAM LINES | $848 | $299 | Implemented |
NC0115 # 05 Y:1997 | 05 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $726 | $120 | Implemented |
NC0115 # 04 Y:1997 | 04 | 1997 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,108 | $4,000 | Not Implemented |
NC0115 # 03 Y:1997 | 03 | 1997 | REDUCE VENTILATION AIR | $6,190 | $2,765 | Not Implemented |
NC0115 # 02 Y:1997 | 02 | 1997 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,149 | $320 | Implemented |
NC0115 # 01 Y:1997 | 01 | 1997 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $21,668 | $17,363 | Implemented |
NC0039 # 11 Y:1994 | 11 | 1994 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $1,900 | $500 | Not Implemented |
NC0039 # 01 Y:1994 | 01 | 1994 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,241 | $2,018 | Implemented |
NC0039 # 10 Y:1994 | 10 | 1994 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $18,760 | $16,000 | Not Implemented |
NC0039 # 09 Y:1994 | 09 | 1994 | USE POWER DURING OFF-PEAK PERIODS | $8,928 | $0 | Implemented |
NC0039 # 08 Y:1994 | 08 | 1994 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $156 | $570 | Not Implemented |
NC0039 # 07 Y:1994 | 07 | 1994 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,306 | $5,070 | Not Implemented |
NC0039 # 06 Y:1994 | 06 | 1994 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,307 | $2,500 | Not Implemented |
NC0039 # 05 Y:1994 | 05 | 1994 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,600 | $420 | Not Implemented |
NC0039 # 04 Y:1994 | 04 | 1994 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,710 | $600 | Not Implemented |
NC0039 # 03 Y:1994 | 03 | 1994 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $1,432 | $1,500 | Not Implemented |
NC0039 # 02 Y:1994 | 02 | 1994 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $3,052 | $3,850 | Not Implemented |