IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

62

matching recommendations
Reset
SIC 3494 Valves And Pipe Fittings, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0852 # 08 Y:2013 08 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,138 $17,292 Not Implemented
OK0852 # 05 Y:2013 05 2013 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,781 $1,440 Not Implemented
OK0852 # 01 Y:2013 01 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,621 $2,310 Implemented
OK0852 # 07 Y:2013 07 2013 INSTALL SET-BACK TIMERS $1,467 $1,038 Not Implemented
OK0852 # 06 Y:2013 06 2013 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $1,139 $344 Implemented
OK0852 # 04 Y:2013 04 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $497 $1,388 Implemented
OK0852 # 03 Y:2013 03 2013 RECOVER WASTE HEAT FROM EQUIPMENT $2,590 $2,756 Not Implemented
OK0852 # 02 Y:2013 02 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,456 $0 Not Implemented
OK0852 # 09 Y:2013 09 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $838 $3,718 Implemented
OK0852 # 10 Y:2013 10 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,935 $10,793 Not Implemented
OK0852 # 11 Y:2013 11 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,792 $550 Implemented
OK0595 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $621 $1,212 Not Implemented
OK0595 # 06 Y:2000 06 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,855 $6,930 Implemented
OK0595 # 05 Y:2000 05 2000 INSTALL OCCUPANCY SENSORS $664 $2,106 Not Implemented
OK0595 # 04 Y:2000 04 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,695 $3,700 Implemented
OK0595 # 03 Y:2000 03 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,857 $90,984 Implemented
OK0595 # 02 Y:2000 02 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $520 $708 Not Implemented
OK0595 # 09 Y:2000 09 2000 $36,400 $65,450 Not Implemented
OK0595 # 07 Y:2000 07 2000 INCREASE USE OF AUTOMATION $367,920 $150,000 Implemented
OK0595 # 08 Y:2000 08 2000 $227,760 $30,000 Not Implemented
OK0244 # 07 Y:1988 07 1988 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $172 $20 Not Implemented
OK0244 # 09 Y:1988 09 1988 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $332 $275 Implemented
OK0244 # 08 Y:1988 08 1988 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $717 $380 Not Implemented
OK0244 # 02 Y:1988 02 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $122 $255 Implemented
OK0244 # 04 Y:1988 04 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $435 $0 Implemented