IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

160

matching recommendations
Reset
SIC 3495 Wire Springs
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ND0162 # 04 Y:1993 04 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,926 $500 Implemented
ND0162 # 05 Y:1993 05 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,324 $2,000 Not Implemented
ND0162 # 06 Y:1993 06 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,041 $1,171 Implemented
ND0162 # 07 Y:1993 07 1993 OPTIMIZE PLANT POWER FACTOR $1,042 $600 Not Implemented
ND0162 # 08 Y:1993 08 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $84 $120 Not Implemented
RU0101 # 01 Y:1990 01 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $976 $0 Implemented
RU0101 # 02 Y:1990 02 1990 COVER OPEN TANKS $16,298 $1,468 Not Implemented
RU0101 # 03 Y:1990 03 1990 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $34,441 $74,800 Implemented
RU0101 # 04 Y:1990 04 1990 INSTALL STORM WINDOWS AND DOORS $545 $750 Implemented
WI0068 # 01 Y:1989 01 1989 INSTALL TIMERS AND/OR THERMOSTATS $5,126 $1,300 Not Implemented
WI0068 # 02 Y:1989 02 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,780 $5,000 Implemented
WI0068 # 03 Y:1989 03 1989 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,616 $7,000 Not Implemented
WI0068 # 04 Y:1989 04 1989 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $1,353 $0 Implemented
WI0068 # 05 Y:1989 05 1989 IMPROVE LUBRICATION PRACTICES $1,174 $0 Not Implemented
WI0068 # 06 Y:1989 06 1989 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,052 $0 Not Implemented
WI0068 # 07 Y:1989 07 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $600 $1,000 Implemented
WI0025 # 01 Y:1988 01 1988 IMPROVE LUBRICATION PRACTICES $1,042 $0 Not Implemented
WI0025 # 02 Y:1988 02 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $470 $0 Implemented
WI0025 # 03 Y:1988 03 1988 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,213 $0 Implemented
WI0025 # 04 Y:1988 04 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $558 $1,000 Not Implemented
WI0025 # 05 Y:1988 05 1988 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $143 $0 Implemented
ST0072 # 01 Y:1986 01 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,729 $90 Implemented
ST0072 # 02 Y:1986 02 1986 RECOVER WASTE HEAT FROM EQUIPMENT $698 $1,000 Implemented
ST0072 # 03 Y:1986 03 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $807 $537 Implemented
ST0072 # 04 Y:1986 04 1986 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $1,017 $0 Implemented