IAC logo
IAC Assessment: WI0068
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0068
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1989
Principal Product MECH.SPRINGS,WIRES FORMS
NAICS n/a
SIC 3495 - Wire Springs
Sales $5,000,000-$10,000,000
# of Employees 100
Plant Area (Sq.Ft.) 0
Annual Production 0 Units
Production Hrs. Annual 5,000
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $68,464 974,209 kWh $0.07
Natural Gas $23,699 6,593 MMBtu $3.59
TOTAL ENERGY COSTS $92,163
RECOMMENDED SAVINGS* $13,701 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,733
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$5,126
Cost:
$1,300
- - $5,126 1,428 - - -
-
kWh
$5,126
1,428
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,780
Cost:
$5,000
$2,780 39,566 - - - - $2,780
39,566
kWh
-
-
MMBtu
-
-
$
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$1,616
Cost:
$7,000
- - $1,616 450 - - -
-
kWh
$1,616
450
MMBtu
-
-
$
04: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$1,353
Cost:
-
- - $1,353 - - - -
-
kWh
$1,353
-
MMBtu
-
-
$
05: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$1,174
Cost:
-
$1,174 16,706 - - - - $1,174
16,706
kWh
-
-
MMBtu
-
-
$
06: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$1,052
Cost:
-
$1,152 - - - $(-100) - $1,152
-
kWh
-
-
MMBtu
$(-100)
-
$
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$600
Cost:
$1,000
$600 8,499 - - - - $600
8,499
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$13,701
Cost:
$14,300
$5,706 64,771 $8,095 1,878 $(-100) - $5,706
64,771
kWh
$8,095
1,878
MMBtu
$(-100)
-
$
TOTAL IMPLEMENTED Savings:
$4,733
Cost:
$6,000
$3,380 48,065 $1,353 - - - $3,380
48,065
kWh
$1,353
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes