Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

661

matching recommendations
Reset
SIC 3496 Misc. Fabricated Wire Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0331 # 09 Y:2006 09 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $686 $440 Implemented
WV0331 # 08 Y:2006 08 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $778 $1,460 Implemented
WV0331 # 07 Y:2006 07 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,352 $1,000 Implemented
WV0331 # 06 Y:2006 06 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,523 $320 Implemented
WV0331 # 05 Y:2006 05 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,906 $1,560 Implemented
WV0331 # 04 Y:2006 04 2006 INSULATE BARE EQUIPMENT $3,957 $2,264 Implemented
WV0331 # 03 Y:2006 03 2006 REDUCE VENTILATION AIR $9,874 $3,940 Not Implemented
WV0331 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,865 $22,825 Implemented
WV0331 # 01 Y:2006 01 2006 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $15,465 $18,600 Not Implemented
IA0364 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,080 $1,210 Not Implemented
IA0364 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,156 $6,174 Not Implemented
IA0364 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,554 $6,744 Not Implemented
IA0364 # 04 Y:2005 04 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,547 $8,960 Not Implemented
IA0364 # 05 Y:2005 05 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,078 $900 Not Implemented
IA0364 # 06 Y:2005 06 2005 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $6,250 $1,800 Not Implemented
IA0364 # 07 Y:2005 07 2005 INSTALL AUTOMATIC PART STORAGE / RETREVAL SYSTEM $37,500 $15,000 Not Implemented
IA0364 # 08 Y:2005 08 2005 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $1,562 $425 Not Implemented
IA0364 # 09 Y:2005 09 2005 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $1,040 $640 Not Implemented
IA0364 # 10 Y:2005 10 2005 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $26,250 $650 Not Implemented
IA0364 # 11 Y:2005 11 2005 USE EVAPORATION TO CONCENTRATE MATERIAL $18,149 $1,500 Not Implemented
IA0364 # 12 Y:2005 12 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,870 $1,000 Not Implemented
IA0364 # 13 Y:2005 13 2005 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $31,486 $50,000 Not Implemented
IA0364 # 14 Y:2005 14 2005 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $106,060 $8,250 Not Implemented
LE0212 # 01 Y:2005 01 2005 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $600,960 $1,440,000 Not Implemented
LE0212 # 02 Y:2005 02 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $38,827 $28,400 Implemented