Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
661
matching recommendationsSIC | 3496 | Misc. Fabricated Wire Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0618 # 01 Y:2012 | 01 | 2012 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $23,700 | $0 | Not Implemented |
AM0618 # 02 Y:2012 | 02 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,050 | $500 | Not Implemented |
AM0618 # 03 Y:2012 | 03 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,200 | $17,720 | Not Implemented |
AM0618 # 04 Y:2012 | 04 | 2012 | REUSE RAGS UNTIL COMPLETELY SOILED | $2,230 | $0 | Not Implemented |
AM0618 # 05 Y:2012 | 05 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,940 | $920 | Not Implemented |
AM0618 # 06 Y:2012 | 06 | 2012 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $1,000 | $190 | Not Implemented |
AM0618 # 07 Y:2012 | 07 | 2012 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $750 | $0 | Not Implemented |
AM0618 # 08 Y:2012 | 08 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $650 | $25 | Not Implemented |
AM0618 # 09 Y:2012 | 09 | 2012 | USE SYNTHETIC LUBRICANT | $360 | $0 | Not Implemented |
MAS023 # 01 Y:2012 | 01 | 2012 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $10,820 | $44,000 | Implemented |
MAS023 # 02 Y:2012 | 02 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,502 | $7,500 | Implemented |
MAS023 # 03 Y:2012 | 03 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,970 | $8,500 | Implemented |
MAS023 # 04 Y:2012 | 04 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,899 | $9,580 | Implemented |
MAS023 # 05 Y:2012 | 05 | 2012 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $3,978 | $3,000 | Not Implemented |
MAS023 # 06 Y:2012 | 06 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,575 | $3,130 | Not Implemented |
MAS023 # 07 Y:2012 | 07 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $596 | $0 | Implemented |
OK0821 # 01 Y:2012 | 01 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $43,921 | $24,480 | Not Implemented |
OK0821 # 02 Y:2012 | 02 | 2012 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $3,466 | $2,840 | Implemented |
OK0821 # 03 Y:2012 | 03 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,363 | $2,514 | Not Implemented |
OK0821 # 04 Y:2012 | 04 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,847 | $15,486 | Implemented |
OK0821 # 05 Y:2012 | 05 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,712 | $15,478 | Implemented |
OK0821 # 06 Y:2012 | 06 | 2012 | UPGRADE CONTROLS ON COMPRESSORS | $17,137 | $0 | Implemented |
OK0821 # 07 Y:2012 | 07 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,375 | $1,700 | Implemented |
OK0821 # 08 Y:2012 | 08 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,301 | $0 | Implemented |
OK0821 # 09 Y:2012 | 09 | 2012 | REPLACE BOILER | $21,929 | $26,400 | Not Implemented |