Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

527

matching recommendations
Reset
SIC 3498 Fabricated Pipe And Fittings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0162 # 01 Y:1985 01 1985 INSTALL TIMERS AND/OR THERMOSTATS $6,361 $1,022 Not Implemented
OK0162 # 02 Y:1985 02 1985 OPTIMIZE PLANT POWER FACTOR $900 $2,355 Not Implemented
OK0162 # 03 Y:1985 03 1985 INSTALL / REPAIR INSULATION ON STEAM LINES $799 $400 Not Implemented
OK0162 # 04 Y:1985 04 1985 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $146 $310 Not Implemented
OK0162 # 05 Y:1985 05 1985 REDESIGN PROCESS $529 $33 Not Implemented
OK0162 # 06 Y:1985 06 1985 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,273 $10,000 Not Implemented
PV0002 # 01 Y:1985 01 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $375 $79 Not Implemented
PV0002 # 02 Y:1985 02 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,792 $10 Not Implemented
PV0002 # 03 Y:1985 03 1985 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $4,393 $0 Not Implemented
TN0215 # 01 Y:1984 01 1984 COVER OPEN TANKS $10,482 $3,500 Implemented
TN0215 # 02 Y:1984 02 1984 INSTALL TIMERS AND/OR THERMOSTATS $12,107 $1,000 Implemented
TN0215 # 03 Y:1984 03 1984 INSTALL / REPAIR INSULATION ON STEAM LINES $2,092 $300 Implemented
TN0215 # 04 Y:1984 04 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,311 $175 Implemented
TN0215 # 05 Y:1984 05 1984 REDUCE FLUID FLOW RATES $5,029 $1,680 Not Implemented
TN0215 # 06 Y:1984 06 1984 INSTALL SET-BACK TIMERS $3,077 $0 Implemented
TN0215 # 07 Y:1984 07 1984 USE MINIMUM STEAM OPERATING PRESSURE $427 $0 Implemented
OK0051 # 01 Y:1982 01 1982 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,367 $200 Implemented
OK0051 # 02 Y:1982 02 1982 RECOVER WASTE HEAT FROM EQUIPMENT $3,675 $3,000 Implemented
OK0051 # 03 Y:1982 03 1982 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $13,620 $8,300 Not Implemented
OK0051 # 04 Y:1982 04 1982 OPTIMIZE PLANT POWER FACTOR $5,976 $3,900 Not Implemented
OK0051 # 05 Y:1982 05 1982 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $130 $0 Implemented
OK0051 # 06 Y:1982 06 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29 $13 Implemented
OK0051 # 07 Y:1982 07 1982 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,612 $12,150 Implemented
TN0113 # 01 Y:1982 01 1982 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,117 $5,000 Not Implemented
TN0113 # 02 Y:1982 02 1982 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $36,010 $16,000 Not Implemented