IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

32

matching recommendations
Reset
SIC 3498 Fabricated Pipe And Fittings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0509 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,482 $2,684 Implemented
IA0509 # 03 Y:2013 03 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,438 $549 Implemented
IA0509 # 04 Y:2013 04 2013 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $5,088 $750 Implemented
IA0509 # 05 Y:2013 05 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $110 $50 Implemented
IA0509 # 06 Y:2013 06 2013 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,616 $30,838 Implemented
IA0509 # 07 Y:2013 07 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,690 $180 Implemented
IA0509 # 08 Y:2013 08 2013 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $684 $870 Implemented
IA0509 # 09 Y:2013 09 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $1,925 $425 Implemented
IA0509 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $80,219 $283,479 Implemented
WV0469 # 02 Y:2013 02 2013 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $11,090 $1,989 Implemented
WV0469 # 12 Y:2013 12 2013 DEVELOP A REPAIR/REPLACE POLICY $77 $281 Not Implemented
WV0469 # 03 Y:2013 03 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,896 $10,694 Not Implemented
WV0469 # 04 Y:2013 04 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,996 $0 Implemented
WV0469 # 05 Y:2013 05 2013 USE DEMAND CONTROLLER OR LOAD SHEDDER $6,853 $5,700 Not Implemented
WV0469 # 06 Y:2013 06 2013 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $5,514 $1,000 Implemented
WV0469 # 07 Y:2013 07 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,550 $4,036 Implemented
WV0469 # 08 Y:2013 08 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,484 $2,292 Not Implemented
WV0469 # 09 Y:2013 09 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,378 $70 Implemented
WV0469 # 10 Y:2013 10 2013 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $706 $460 Not Implemented
WV0469 # 11 Y:2013 11 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $314 $56 Implemented
WV0469 # 01 Y:2013 01 2013 OPTIMIZE PLANT POWER FACTOR $21,317 $6,300 Not Implemented
OK0851 # 06 Y:2013 06 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,400 $1,900 Implemented
OK0851 # 05 Y:2013 05 2013 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $7,400 $44,200 Implemented
OK0851 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $647 $1,132 Not Implemented
OK0851 # 03 Y:2013 03 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,912 $6,000 Not Implemented