IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

92

matching recommendations
Reset
SIC 3499 Fabricated Metal Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0235 # 02 Y:2020 02 2020 INSTALL OCCUPANCY SENSORS $1,398 $3,402 Not Implemented
IC0235 # 03 Y:2020 03 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,555 $1,224 Not Implemented
IC0235 # 04 Y:2020 04 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,628 $0 Not Implemented
IC0235 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $28,357 $32,486 Not Implemented
IP0095 # 08 Y:2018 08 2018 RECOVER WASTE HEAT FROM EQUIPMENT $13,700 $6,580 Not Implemented
IP0095 # 07 Y:2018 07 2018 INSTALL OCCUPANCY SENSORS $2,961 $1,093 Implemented
IP0095 # 06 Y:2018 06 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,356 $3,070 Implemented
IP0095 # 05 Y:2018 05 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,822 $835 Not Implemented
IP0095 # 04 Y:2018 04 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $17,327 $3,124 Not Implemented
IP0095 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $68,255 $11,125 Implemented
IP0095 # 02 Y:2018 02 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,023 $2,041 Implemented
IP0095 # 01 Y:2018 01 2018 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $8,935 $25 Implemented
IP0095 # 09 Y:2018 09 2018 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,060 $2,194 Not Implemented
IP0095 # 10 Y:2018 10 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,136 $3,970 Implemented
IP0095 # 11 Y:2018 11 2018 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $843 $1,000 Not Implemented
IP0059 # 01 Y:2016 01 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,353 $58 Implemented
IP0059 # 02 Y:2016 02 2016 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,602 $99 Implemented
IP0059 # 03 Y:2016 03 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $76 $62 Implemented
IP0059 # 04 Y:2016 04 2016 APPLY FOR INVESTMENT INCENTIVES $1,633 $2,000 Not Implemented
IP0059 # 05 Y:2016 05 2016 INSTALL OCCUPANCY SENSORS $1,345 $3,616 Implemented
IP0059 # 06 Y:2016 06 2016 INSULATE BARE EQUIPMENT $257 $776 Not Implemented
IP0029 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,432 $4,014 Implemented
IP0029 # 04 Y:2014 04 2014 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $82,707 $12,435 Not Implemented
IP0029 # 02 Y:2014 02 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,383 $92 Not Implemented
IP0029 # 01 Y:2014 01 2014 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $9,363 $210 Not Implemented