IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

83

matching recommendations
Reset
SIC 3499 Fabricated Metal Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0266 # 01 Y:2008 01 2008 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $6,391 $0 Not Implemented
SU0266 # 03 Y:2008 03 2008 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,166 $0 Implemented
SU0266 # 02 Y:2008 02 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,817 $0 Not Implemented
SU0266 # 05 Y:2008 05 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,953 $339 Implemented
SU0266 # 08 Y:2008 08 2008 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $7,220 $40,650 Not Implemented
SU0266 # 04 Y:2008 04 2008 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $151,996 $23,800 Not Implemented
SU0266 # 06 Y:2008 06 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,096 $424 Implemented
SU0266 # 07 Y:2008 07 2008 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $114 $65 Not Implemented
SU0265 # 05 Y:2008 05 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $786 $223 Implemented
SU0265 # 03 Y:2008 03 2008 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $214,622 $23,800 Not Implemented
SU0265 # 02 Y:2008 02 2008 USE SYNTHETIC LUBRICANT $191 $0 Not Implemented
SU0265 # 01 Y:2008 01 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $468 $0 Not Implemented
SU0265 # 08 Y:2008 08 2008 OPTIMIZE PLANT POWER FACTOR $921 $4,079 Not Implemented
SU0265 # 07 Y:2008 07 2008 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $171 $310 Not Implemented
SU0265 # 06 Y:2008 06 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,263 $3,368 Not Implemented
SU0265 # 04 Y:2008 04 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,615 $252 Implemented
SU0158 # 03 Y:2003 03 2003 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $95,164 $235,000 Not Implemented
SU0158 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $67,325 $5,200 Implemented
SU0158 # 05 Y:2003 05 2003 OPTIMIZE PLANT POWER FACTOR $24,189 $70,275 Not Implemented
SU0158 # 06 Y:2003 06 2003 USE SYNTHETIC LUBRICANT $10,573 $1,000 Implemented
SU0158 # 07 Y:2003 07 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,432 $0 Implemented
SU0158 # 08 Y:2003 08 2003 RECOVER AND REUSE SPENT ACID BATHS $7,052 $6,521 Not Implemented
SU0158 # 09 Y:2003 09 2003 ELIMINATE SHIFT $5,056 $0 Implemented
SU0158 # 10 Y:2003 10 2003 PAY BILLS ON TIME TO AVOID LATE FEES $4,599 $0 Implemented
SU0158 # 11 Y:2003 11 2003 PAY BILLS ON TIME TO AVOID LATE FEES $2,892 $0 Implemented