IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

52

matching recommendations
Reset
SIC 3499 Fabricated Metal Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0841 # 17 Y:2011 17 2011 INSTALL AUTOMATIC STACK DAMPER $20,941 $600 Implemented
UD0841 # 18 Y:2011 18 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $2,133 $2,098 Implemented
UD0841 # 19 Y:2011 19 2011 REDUCE VENTILATION AIR $174,913 $242,291 Not Implemented
UD0841 # 20 Y:2011 20 2011 USE RADIANT HEATER FOR SPOT HEATING $4,098 $17,940 Not Implemented
NC0426 # 06 Y:2011 06 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $98 $100 Implemented
NC0426 # 05 Y:2011 05 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $302 $25 Implemented
NC0426 # 04 Y:2011 04 2011 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $1,171 $4,700 Not Implemented
NC0426 # 03 Y:2011 03 2011 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,690 $3,750 Not Implemented
NC0426 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $815 $1,530 Implemented
NC0426 # 01 Y:2011 01 2011 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,495 $2,825 Not Implemented
NC0426 # 07 Y:2011 07 2011 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $5,569 $21,550 Not Implemented
MZ0062 # 01 Y:2011 01 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,242 $1,160 Implemented
MZ0062 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,772 $49,280 Implemented
MZ0062 # 03 Y:2011 03 2011 INSTALL OCCUPANCY SENSORS $1,292 $1,840 Not Implemented
MZ0062 # 04 Y:2011 04 2011 INSTALL SPECTRAL REFLECTORS / DELAMP $1,360 $100 Implemented
MZ0062 # 05 Y:2011 05 2011 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $866 $1,498 Not Implemented
MZ0062 # 06 Y:2011 06 2011 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $89,844 $250,000 Not Implemented
MZ0062 # 07 Y:2011 07 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $26,441 $1,300 Implemented
MZ0062 # 08 Y:2011 08 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,105 $15,000 Implemented
MZ0062 # 09 Y:2011 09 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,053 $9,000 Implemented
MZ0062 # 10 Y:2011 10 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $19,502 $30,000 Not Implemented
MZ0062 # 11 Y:2011 11 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $17,836 $10,000 Implemented
MZ0062 # 12 Y:2011 12 2011 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $62 $60 Not Implemented
MZ0062 # 13 Y:2011 13 2011 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $91 $300 Implemented
MZ0062 # 14 Y:2011 14 2011 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $11,657 $150,000 Implemented