Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,117
matching recommendationsSIC | 3499 | Fabricated Metal Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0373 # 05 Y:2010 | 05 | 2010 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $5,428 | $1,040 | Not Implemented |
UM0373 # 06 Y:2010 | 06 | 2010 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,651 | $6,300 | Not Implemented |
UD0823 # 01 Y:2010 | 01 | 2010 | COMBINE UTILITY METERS | $6,391 | $200 | Not Implemented |
UD0823 # 02 Y:2010 | 02 | 2010 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,915 | $25 | Not Implemented |
UD0823 # 03 Y:2010 | 03 | 2010 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $253 | $25 | Not Implemented |
UD0823 # 04 Y:2010 | 04 | 2010 | INSTALL WIND POWERED ELECTRIC GENERATOR | $1,820,272 | $1,400,000 | Not Implemented |
UD0823 # 05 Y:2010 | 05 | 2010 | USE SOLAR HEAT TO MAKE ELECTRICTY | $26,291 | $98,085 | Not Implemented |
UD0823 # 06 Y:2010 | 06 | 2010 | INSTALL OCCUPANCY SENSORS | $17,201 | $7,375 | Implemented |
UD0823 # 07 Y:2010 | 07 | 2010 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $21,736 | $125 | Not Implemented |
UD0823 # 08 Y:2010 | 08 | 2010 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,268 | $25 | Implemented |
UD0823 # 09 Y:2010 | 09 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $580 | $500 | Not Implemented |
UD0823 # 10 Y:2010 | 10 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $524 | $25 | Implemented |
UD0823 # 11 Y:2010 | 11 | 2010 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $19,629 | $7,500 | Not Implemented |
UD0823 # 12 Y:2010 | 12 | 2010 | USE OPTIMUM TEMPERATURE | $3,244 | $63 | Not Implemented |
UD0823 # 13 Y:2010 | 13 | 2010 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $10,010 | $50,050 | Implemented |
UD0823 # 14 Y:2010 | 14 | 2010 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $1,832 | $9,160 | Not Implemented |
UD0823 # 15 Y:2010 | 15 | 2010 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $355 | $25 | Implemented |
OK0782 # 01 Y:2009 | 01 | 2009 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $852 | $354 | Implemented |
OK0782 # 02 Y:2009 | 02 | 2009 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,732 | $3,742 | Not Implemented |
OK0782 # 03 Y:2009 | 03 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,733 | $0 | Implemented |
OK0782 # 04 Y:2009 | 04 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,005 | $7,542 | Not Implemented |
OK0782 # 05 Y:2009 | 05 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,300 | $11,120 | Not Implemented |
OK0782 # 06 Y:2009 | 06 | 2009 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $804 | $4,800 | Not Implemented |
OK0782 # 07 Y:2009 | 07 | 2009 | INSTALL / REPAIR INSULATION ON STEAM LINES | $4,815 | $820 | Implemented |
OK0782 # 08 Y:2009 | 08 | 2009 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $700 | $1,825 | Implemented |