Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
94
matching recommendationsSIC | 3499 | Fabricated Metal Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0147 # 11 Y:2008 | 11 | 2008 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $6,598 | $9,911 | Implemented |
IC0147 # 10 Y:2008 | 10 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,527 | $30,225 | Implemented |
IC0147 # 09 Y:2008 | 09 | 2008 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $200 | $246 | Implemented |
IC0147 # 08 Y:2008 | 08 | 2008 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,952 | $15,562 | Implemented |
IC0147 # 07 Y:2008 | 07 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $133 | $398 | Implemented |
IC0147 # 06 Y:2008 | 06 | 2008 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $24,605 | $0 | Implemented |
IC0147 # 05 Y:2008 | 05 | 2008 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $395 | $250 | Implemented |
IC0147 # 04 Y:2008 | 04 | 2008 | DISCONNECT BALLASTS | $4,311 | $4,750 | Implemented |
IC0147 # 03 Y:2008 | 03 | 2008 | INSTALL OCCUPANCY SENSORS | $1,712 | $2,967 | Implemented |
UM0292 # 05 Y:2005 | 05 | 2005 | RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS | $1,193 | $3,000 | Not Implemented |
UM0292 # 06 Y:2005 | 06 | 2005 | INSTALL OCCUPANCY SENSORS | $821 | $368 | Not Implemented |
UM0292 # 04 Y:2005 | 04 | 2005 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,943 | $50 | Implemented |
UM0292 # 03 Y:2005 | 03 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,782 | $480 | Implemented |
UM0292 # 02 Y:2005 | 02 | 2005 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $5,368 | $5,000 | Implemented |
UM0292 # 01 Y:2005 | 01 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,731 | $23,005 | Not Implemented |
UM0204 # 05 Y:2002 | 05 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $960 | $1,000 | Not Implemented |
UM0204 # 04 Y:2002 | 04 | 2002 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,160 | $500 | Implemented |
UM0204 # 03 Y:2002 | 03 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,220 | $1,220 | Implemented |
UM0204 # 06 Y:2002 | 06 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $330 | $375 | Implemented |
UM0204 # 02 Y:2002 | 02 | 2002 | OPTIMIZE PLANT POWER FACTOR | $2,700 | $4,970 | Implemented |
UM0204 # 01 Y:2002 | 01 | 2002 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $22,500 | $27,500 | Not Implemented |
UM0166 # 04 Y:2000 | 04 | 2000 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,595 | $11,900 | Not Implemented |
UM0166 # 05 Y:2000 | 05 | 2000 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $562 | $3,120 | Not Implemented |
UM0166 # 06 Y:2000 | 06 | 2000 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $5,705 | $5,925 | Implemented |
UM0166 # 03 Y:2000 | 03 | 2000 | USE RADIANT HEATER FOR SPOT HEATING | $2,815 | $10,000 | Not Implemented |