IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

94

matching recommendations
Reset
SIC 3499 Fabricated Metal Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0147 # 11 Y:2008 11 2008 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $6,598 $9,911 Implemented
IC0147 # 10 Y:2008 10 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,527 $30,225 Implemented
IC0147 # 09 Y:2008 09 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $200 $246 Implemented
IC0147 # 08 Y:2008 08 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,952 $15,562 Implemented
IC0147 # 07 Y:2008 07 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $133 $398 Implemented
IC0147 # 06 Y:2008 06 2008 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $24,605 $0 Implemented
IC0147 # 05 Y:2008 05 2008 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $395 $250 Implemented
IC0147 # 04 Y:2008 04 2008 DISCONNECT BALLASTS $4,311 $4,750 Implemented
IC0147 # 03 Y:2008 03 2008 INSTALL OCCUPANCY SENSORS $1,712 $2,967 Implemented
UM0292 # 05 Y:2005 05 2005 RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS $1,193 $3,000 Not Implemented
UM0292 # 06 Y:2005 06 2005 INSTALL OCCUPANCY SENSORS $821 $368 Not Implemented
UM0292 # 04 Y:2005 04 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,943 $50 Implemented
UM0292 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,782 $480 Implemented
UM0292 # 02 Y:2005 02 2005 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,368 $5,000 Implemented
UM0292 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,731 $23,005 Not Implemented
UM0204 # 05 Y:2002 05 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $960 $1,000 Not Implemented
UM0204 # 04 Y:2002 04 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,160 $500 Implemented
UM0204 # 03 Y:2002 03 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,220 $1,220 Implemented
UM0204 # 06 Y:2002 06 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $330 $375 Implemented
UM0204 # 02 Y:2002 02 2002 OPTIMIZE PLANT POWER FACTOR $2,700 $4,970 Implemented
UM0204 # 01 Y:2002 01 2002 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $22,500 $27,500 Not Implemented
UM0166 # 04 Y:2000 04 2000 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,595 $11,900 Not Implemented
UM0166 # 05 Y:2000 05 2000 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $562 $3,120 Not Implemented
UM0166 # 06 Y:2000 06 2000 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,705 $5,925 Implemented
UM0166 # 03 Y:2000 03 2000 USE RADIANT HEATER FOR SPOT HEATING $2,815 $10,000 Not Implemented