IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

144

matching recommendations
Reset
SIC 3499 Fabricated Metal Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LM0052 # 03 Y:2003 03 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,671 $2,725 Not Implemented
LM0052 # 04 Y:2003 04 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $143 $100 Not Implemented
LM0052 # 05 Y:2003 05 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $520 $0 Implemented
LM0052 # 06 Y:2003 06 2003 $120,656 $39,410 n/a
LM0052 # 07 Y:2003 07 2003 $126,133 $2,000 Not Implemented
LM0002 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,192 $3,285 Not Implemented
LM0002 # 02 Y:2001 02 2001 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $1,259 $3,158 Not Implemented
LM0002 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,253 $250 Implemented
LM0002 # 04 Y:2001 04 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $508 $0 Implemented
LM0002 # 05 Y:2001 05 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $6,282 $12,475 Not Implemented
LM0002 # 06 Y:2001 06 2001 USE ULTRASONIC CLEANING $100,100 $90,000 Not Implemented
LM0002 # 07 Y:2001 07 2001 $128,500 $0 Implemented
NV0140 # 01 Y:1999 01 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $110 $52 Not Implemented
NV0140 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,840 $800 Implemented
NV0140 # 03 Y:1999 03 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,509 $4,692 Implemented
NV0140 # 04 Y:1999 04 1999 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $556 $1,360 Not Implemented
NV0140 # 05 Y:1999 05 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $2,041 $0 Not Implemented
SD0218 # 01 Y:1999 01 1999 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,815 $240 Implemented
SD0218 # 02 Y:1999 02 1999 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $62,663 $2,000 Not Implemented
SD0218 # 03 Y:1999 03 1999 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM $39,599 $12,550 Not Implemented
SD0218 # 04 Y:1999 04 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $40,547 $65,000 Not Implemented
SD0218 # 05 Y:1999 05 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $49,560 $10,000 Not Implemented
SD0218 # 06 Y:1999 06 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $32,441 $102,000 Not Implemented
SD0218 # 07 Y:1999 07 1999 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $25,085 $18,000 Not Implemented
SD0218 # 08 Y:1999 08 1999 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,000 $0 Implemented