IAC logo
IAC Assessment: LM0087
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LM0087
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Loyola Marymount University
Assessment Year 2005
Principal Product stainless plumbing
NAICS 332999 - All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3499 - Fabricated Metal Products, Nec
Sales $50,000,000-$100,000,000
# of Employees 500
Plant Area (Sq.Ft.) 136,700
Annual Production 500,000 Pounds
Production Hrs. Annual 4,000
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $195,557 2,237,735 kWh $0.09
Electricity Demand $85,976 7,668 kW-months/year $11.21
Electricity Fees $3,850 - $ -
Natural Gas $9,472 1,190 MMBtu $7.96
TOTAL ENERGY COSTS $294,855
RECOMMENDED SAVINGS* $63,698 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $37,600
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Primary Product Electricity Usage Electricity Demand Personnel Changes Primary Product
$ kWh $ kW-months/year $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,069
Cost:
$17,418
$4,370 50,160 $1,699 750 - - - - $4,370
50,160
kWh
$1,699
750
kW-months/year
-
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$10,466
Cost:
$760
$7,538 86,520 $2,928 241 - - - - $7,538
86,520
kWh
$2,928
241
kW-months/year
-
-
$
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,413
Cost:
-
$1,017 11,670 $396 35 - - - - $1,017
11,670
kWh
$396
35
kW-months/year
-
-
$
-
-
$
04: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$1,685
Cost:
$450
$709 - $976 - - - - - $709
-
kWh
$976
-
kW-months/year
-
-
$
-
-
$
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$244
Cost:
$377
$139 1,597 $105 10 - - - - $139
1,597
kWh
$105
10
kW-months/year
-
-
$
-
-
$
06: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$1,321
Cost:
$1,000
$951 10,912 $370 32 - - - - $951
10,912
kWh
$370
32
kW-months/year
-
-
$
-
-
$
07: 4.426 MODIFY WORKLOAD Savings:
$23,000
Cost:
$9,700
- - - - $23,000 - - - -
-
kWh
-
-
kW-months/year
$23,000
-
$
-
-
$
08: 4.122 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS Savings:
$19,500
Cost:
$3,680
- - - - - - $19,500 - -
-
kWh
-
-
kW-months/year
-
-
$
$19,500
-
$
TOTAL RECOMMENDED Savings:
$63,698
Cost:
$33,385
$14,724 160,859 $6,474 1,068 $23,000 - $19,500 - $14,724
160,859
kWh
$6,474
1,068
kW-months/year
$23,000
-
$
$19,500
-
$
TOTAL IMPLEMENTED Savings:
$37,600
Cost:
$23,235
$12,998 149,189 $5,102 1,033 - - $19,500 - $12,998
149,189
kWh
$5,102
1,033
kW-months/year
-
-
$
$19,500
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Primary Product Electricity Usage Electricity Demand Personnel Changes Primary Product