IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

213

matching recommendations
Reset
SIC 3499 Fabricated Metal Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0688 # 05 Y:2004 05 2004 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $12,457 $31,250 Implemented
UD0688 # 06 Y:2004 06 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,875 $7,400 Not Implemented
UD0688 # 07 Y:2004 07 2004 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $10,025 $30,885 Not Implemented
UD0688 # 08 Y:2004 08 2004 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $10,000 $1,040 Implemented
UD0688 # 09 Y:2004 09 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $5,165 $6,370 Implemented
UD0688 # 10 Y:2004 10 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,750 $1,005 Not Implemented
UD0688 # 11 Y:2004 11 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,745 $470 Implemented
UD0688 # 12 Y:2004 12 2004 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $3,670 $6,000 Not Implemented
UD0688 # 13 Y:2004 13 2004 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $2,840 $0 Implemented
UD0688 # 14 Y:2004 14 2004 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,460 $0 Implemented
UD0688 # 15 Y:2004 15 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,100 $1,500 Not Implemented
UD0688 # 16 Y:2004 16 2004 COVER OPEN TANKS $2,010 $2,440 Not Implemented
UD0688 # 17 Y:2004 17 2004 REDUCE VENTILATION AIR $1,805 $73 Not Implemented
UD0688 # 18 Y:2004 18 2004 INSULATE BARE EQUIPMENT $880 $1,820 Implemented
UD0618 # 01 Y:2001 01 2001 INCREASE USE OF AUTOMATION $124,000 $240,000 Not Implemented
UD0618 # 02 Y:2001 02 2001 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $26,445 $5,700 Not Implemented
UD0618 # 03 Y:2001 03 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,036 $25,000 Not Implemented
UD0618 # 04 Y:2001 04 2001 INSTALL / REPAIR INSULATION ON STEAM LINES $8,474 $6,280 Implemented
UD0618 # 05 Y:2001 05 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,038 $1,450 Implemented
UD0618 # 06 Y:2001 06 2001 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,458 $5,700 Not Implemented
UD0618 # 07 Y:2001 07 2001 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $4,522 $3,000 Not Implemented
UD0618 # 08 Y:2001 08 2001 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $3,394 $0 Not Implemented
UD0618 # 09 Y:2001 09 2001 INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER $1,779 $5,000 Not Implemented
UD0618 # 10 Y:2001 10 2001 METER WASTE WATER $1,284 $500 Not Implemented
WV0187 # 01 Y:2000 01 2000 INSULATE BARE EQUIPMENT $60,258 $11,500 Not Implemented