IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,117

matching recommendations
Reset
SIC 3499 Fabricated Metal Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0038 # 06 Y:1994 06 1994 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $11,775 $7,000 Implemented
NC0038 # 07 Y:1994 07 1994 INSULATE BARE EQUIPMENT $9,420 $1,500 Implemented
NC0038 # 08 Y:1994 08 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,154 $2,128 Implemented
ME0137 # 01 Y:1994 01 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $42,534 $50,000 Not Implemented
ME0137 # 02 Y:1994 02 1994 USE OPTIMUM THICKNESS INSULATION $22,500 $4,500 Not Implemented
ME0137 # 03 Y:1994 03 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $35,300 $70,000 Not Implemented
ME0137 # 04 Y:1994 04 1994 OPTIMIZE PLANT POWER FACTOR $9,485 $9,080 Not Implemented
ME0137 # 05 Y:1994 05 1994 METER WASTE WATER $18,700 $1,350 Not Implemented
ME0137 # 06 Y:1994 06 1994 REDUCE FLUID FLOW RATES $1,088 $1,010 Not Implemented
ME0137 # 07 Y:1994 07 1994 RECOVER WASTE HEAT FROM EQUIPMENT $6,915 $30,000 Not Implemented
BD0009 # 01 Y:1994 01 1994 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $8,608 $12,904 Not Implemented
BD0009 # 02 Y:1994 02 1994 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $4,553 $5,412 Not Implemented
BD0009 # 03 Y:1994 03 1994 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,666 $1,430 Implemented
BD0009 # 04 Y:1994 04 1994 RECOVER WASTE HEAT FROM EQUIPMENT $226 $100 Implemented
BD0009 # 05 Y:1994 05 1994 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $14,608 $1,500 Not Implemented
CO0292 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,990 $4,690 Implemented
CO0292 # 02 Y:1994 02 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,930 $2,400 Implemented
CO0292 # 03 Y:1994 03 1994 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,860 $250 Implemented
CO0292 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,630 $3,840 Implemented
CO0292 # 05 Y:1994 05 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,150 $4,660 Not Implemented
CO0292 # 06 Y:1994 06 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $910 $2,080 Implemented
CO0292 # 07 Y:1994 07 1994 INSTALL TIMERS AND/OR THERMOSTATS $460 $300 Implemented
CO0292 # 08 Y:1994 08 1994 INSULATE BARE EQUIPMENT $360 $610 Not Implemented
AS0107 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,764 $5,283 Implemented
AS0107 # 02 Y:1994 02 1994 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $4,565 $12,000 Implemented