IAC Center | Notre Dame Univ. |
---|---|
Assessment Year | 1995 |
Principal Product | fuel rails |
NAICS | n/a |
SIC | 3499 - Fabricated Metal Products, Nec |
Sales | $50,000,000-$100,000,000 |
# of Employees | 550 |
Plant Area (Sq.Ft.) | 130,000 |
Annual Production | 6,300,000 Pieces |
Production Hrs. Annual | 6,800 |
Location (State) | IN |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $563,308 | 9,084,115 | kWh | $0.06 |
Natural Gas | $104,524 | 17,979 | MMBtu | $5.81 |
TOTAL ENERGY COSTS | $907,517 | |||
RECOMMENDED SAVINGS* | $35,853 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Other Liquid (non-haz) | Other Liquid (haz) | Gaseous Waste | Electricity Usage | Natural Gas | Other Liquid (non-haz) | Other Liquid (haz) | Gaseous Waste | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | gal | $ | gal | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $5,630 Cost: $6,024 |
$5,630 | - | - | - | - | - | - | - | - | - |
$5,630 - kWh |
- - MMBtu |
- - gal |
- - gal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $770 Cost: $870 |
$770 | 12,309 | - | - | - | - | - | - | - | - |
$770 12,309 kWh |
- - MMBtu |
- - gal |
- - gal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $189 Cost: $250 |
- | - | $189 | 33 | - | - | - | - | - | - |
- - kWh |
$189 33 MMBtu |
- - gal |
- - gal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $156 Cost: $740 |
$156 | 2,638 | - | - | - | - | - | - | - | - |
$156 2,638 kWh |
- - MMBtu |
- - gal |
- - gal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $7,286 Cost: $3,500 |
$7,286 | 117,526 | - | - | - | - | - | - | - | - |
$7,286 117,526 kWh |
- - MMBtu |
- - gal |
- - gal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,453 Cost: $750 |
$1,453 | 23,447 | - | - | - | - | - | - | - | - |
$1,453 23,447 kWh |
- - MMBtu |
- - gal |
- - gal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $368 Cost: $1,080 |
$368 | 5,275 | - | - | - | - | - | - | - | - |
$368 5,275 kWh |
- - MMBtu |
- - gal |
- - gal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $8,974 Cost: $8,710 |
$8,974 | 144,783 | - | - | - | - | - | - | - | - |
$8,974 144,783 kWh |
- - MMBtu |
- - gal |
- - gal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS |
Savings: $6,558 Cost: $750 |
- | - | - | - | - | - | - | - | $6,558 | 22,860 |
- - kWh |
- - MMBtu |
- - gal |
- - gal |
$6,558 22,860 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 3.3128 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS |
Savings: $4,457 Cost: $3,000 |
- | - | - | - | $2,195 | 1,025,916 | $2,262 | 119 | - | - |
- - kWh |
- - MMBtu |
$2,195 1,025,916 gal |
$2,262 119 gal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 3.1242 ALLOW DRAINAGE BEFORE WITHDRAWING OBJECT |
Savings: $12 Cost: $15 |
- | - | - | - | $12 | 5,667 | - | - | - | - |
- - kWh |
- - MMBtu |
$12 5,667 gal |
- - gal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $35,853 Cost: $25,689 |
$24,637 | 305,978 | $189 | 33 | $2,207 | 1,031,583 | $2,262 | 119 | $6,558 | 22,860 | $24,637 305,978 kWh |
$189 33 MMBtu |
$2,207 1,031,583 gal |
$2,262 119 gal |
$6,558 22,860 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - - kWh |
- - MMBtu |
- - gal |
- - gal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | gal | $ | gal | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Other Liquid (non-haz) | Other Liquid (haz) | Gaseous Waste | Electricity Usage | Natural Gas | Other Liquid (non-haz) | Other Liquid (haz) | Gaseous Waste |