Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Notre Dame Univ. |
---|---|
Assessment Year | 1995 |
Principal Product | fuel rails |
NAICS | n/a |
SIC | 3499 - Fabricated Metal Products, Nec |
Sales | $50,000,000-$100,000,000 |
# of Employees | 550 |
Plant Area (Sq.Ft.) | 130,000 |
Annual Production | 6,300,000 Pieces |
Production Hrs. Annual | 6,800 |
Location (State) | IN |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $563,308 | 9,084,115 | kWh | $0.06 |
Natural Gas | $104,524 | 17,979 | MMBtu | $5.81 |
TOTAL ENERGY COSTS | $907,517 | |||
RECOMMENDED SAVINGS* | $35,853 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Other Liquid (non-haz) | Other Liquid (haz) | Gaseous Waste | Electricity Usage | Natural Gas | Other Liquid (non-haz) | Other Liquid (haz) | Gaseous Waste | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | gal | $ | gal | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $5,630 Cost: $6,024 |
$5,630 | - | - | - | - | - | - | - | - | - |
$5,630 - kWh |
- - MMBtu |
- - gal |
- - gal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $770 Cost: $870 |
$770 | 12,309 | - | - | - | - | - | - | - | - |
$770 12,309 kWh |
- - MMBtu |
- - gal |
- - gal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $189 Cost: $250 |
- | - | $189 | 33 | - | - | - | - | - | - |
- - kWh |
$189 33 MMBtu |
- - gal |
- - gal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $156 Cost: $740 |
$156 | 2,638 | - | - | - | - | - | - | - | - |
$156 2,638 kWh |
- - MMBtu |
- - gal |
- - gal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $7,286 Cost: $3,500 |
$7,286 | 117,526 | - | - | - | - | - | - | - | - |
$7,286 117,526 kWh |
- - MMBtu |
- - gal |
- - gal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,453 Cost: $750 |
$1,453 | 23,447 | - | - | - | - | - | - | - | - |
$1,453 23,447 kWh |
- - MMBtu |
- - gal |
- - gal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $368 Cost: $1,080 |
$368 | 5,275 | - | - | - | - | - | - | - | - |
$368 5,275 kWh |
- - MMBtu |
- - gal |
- - gal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $8,974 Cost: $8,710 |
$8,974 | 144,783 | - | - | - | - | - | - | - | - |
$8,974 144,783 kWh |
- - MMBtu |
- - gal |
- - gal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS |
Savings: $6,558 Cost: $750 |
- | - | - | - | - | - | - | - | $6,558 | 22,860 |
- - kWh |
- - MMBtu |
- - gal |
- - gal |
$6,558 22,860 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 3.3128 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS |
Savings: $4,457 Cost: $3,000 |
- | - | - | - | $2,195 | 1,025,916 | $2,262 | 119 | - | - |
- - kWh |
- - MMBtu |
$2,195 1,025,916 gal |
$2,262 119 gal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 3.1242 ALLOW DRAINAGE BEFORE WITHDRAWING OBJECT |
Savings: $12 Cost: $15 |
- | - | - | - | $12 | 5,667 | - | - | - | - |
- - kWh |
- - MMBtu |
$12 5,667 gal |
- - gal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $35,853 Cost: $25,689 |
$24,637 | 305,978 | $189 | 33 | $2,207 | 1,031,583 | $2,262 | 119 | $6,558 | 22,860 | $24,637 305,978 kWh |
$189 33 MMBtu |
$2,207 1,031,583 gal |
$2,262 119 gal |
$6,558 22,860 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - - kWh |
- - MMBtu |
- - gal |
- - gal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | gal | $ | gal | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Other Liquid (non-haz) | Other Liquid (haz) | Gaseous Waste | Electricity Usage | Natural Gas | Other Liquid (non-haz) | Other Liquid (haz) | Gaseous Waste |