Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,117
matching recommendationsSIC | 3499 | Fabricated Metal Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0069 # 03 Y:1992 | 03 | 1992 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,765 | $30,882 | Not Implemented |
AS0069 # 04 Y:1992 | 04 | 1992 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,187 | $9,540 | Not Implemented |
AS0069 # 05 Y:1992 | 05 | 1992 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,178 | $0 | Not Implemented |
AS0069 # 06 Y:1992 | 06 | 1992 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $10,010 | $349,500 | Not Implemented |
AS0069 # 07 Y:1992 | 07 | 1992 | PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT | $2,715 | $4,900 | Not Implemented |
AS0069 # 08 Y:1992 | 08 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,565 | $17,450 | Not Implemented |
AS0069 # 09 Y:1992 | 09 | 1992 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,137 | $400 | Not Implemented |
AS0069 # 10 Y:1992 | 10 | 1992 | IMPROVE LUBRICATION PRACTICES | $1,744 | $4,914 | Not Implemented |
SD0029 # 01 Y:1992 | 01 | 1992 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $239 | $173 | Implemented |
SD0029 # 02 Y:1992 | 02 | 1992 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $436 | $73 | Implemented |
SD0029 # 03 Y:1992 | 03 | 1992 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $4,064 | $638 | Not Implemented |
SD0029 # 04 Y:1992 | 04 | 1992 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $7,879 | $3,000 | Implemented |
SD0029 # 05 Y:1992 | 05 | 1992 | INSTALL SET-BACK TIMERS | $1,036 | $560 | Not Implemented |
SD0029 # 06 Y:1992 | 06 | 1992 | INSTALL SET-BACK TIMERS | $1,298 | $800 | Not Implemented |
UD0373 # 01 Y:1992 | 01 | 1992 | OPTIMIZE PLANT POWER FACTOR | $6,664 | $8,600 | Implemented |
UD0373 # 02 Y:1992 | 02 | 1992 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,724 | $0 | Implemented |
UD0373 # 03 Y:1992 | 03 | 1992 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,415 | $3,000 | Not Implemented |
UD0373 # 04 Y:1992 | 04 | 1992 | METER WASTE WATER | $14,996 | $300,000 | Implemented |
UD0373 # 05 Y:1992 | 05 | 1992 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $6,143 | $15,000 | Not Implemented |
KU0373 # 01 Y:1992 | 01 | 1992 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $823 | $3,076 | Not Implemented |
KU0373 # 02 Y:1992 | 02 | 1992 | INSTALL TIMERS AND/OR THERMOSTATS | $793 | $935 | Not Implemented |
KU0373 # 03 Y:1992 | 03 | 1992 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $572 | $385 | Not Implemented |
KU0373 # 04 Y:1992 | 04 | 1992 | INSTALL SET-BACK TIMERS | $543 | $570 | Not Implemented |
KU0373 # 05 Y:1992 | 05 | 1992 | RECOVER WASTE HEAT FROM EQUIPMENT | $331 | $101 | Implemented |
KU0373 # 06 Y:1992 | 06 | 1992 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $296 | $320 | Not Implemented |