IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,101

matching recommendations
Reset
SIC 3499 Fabricated Metal Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
RU0150 # 07 Y:1992 07 1992 OPTIMIZE PLANT POWER FACTOR $5,770 $0 Not Implemented
RU0150 # 08 Y:1992 08 1992 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $123,105 $327,000 Not Implemented
CO0241 # 01 Y:1992 01 1992 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $3,250 $5 Implemented
CO0241 # 02 Y:1992 02 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,920 $3,500 Implemented
CO0241 # 03 Y:1992 03 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $530 $200 Implemented
CO0241 # 04 Y:1992 04 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $370 $110 Implemented
CO0241 # 05 Y:1992 05 1992 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $460 $250 Implemented
CO0241 # 06 Y:1992 06 1992 INSULATE BARE EQUIPMENT $340 $450 Implemented
CO0241 # 07 Y:1992 07 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $240 $1,110 Implemented
OK0351 # 01 Y:1991 01 1991 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $10,327 $13,900 Not Implemented
OK0351 # 02 Y:1991 02 1991 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $15,053 $0 Not Implemented
OK0351 # 03 Y:1991 03 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,637 $0 Not Implemented
OK0351 # 04 Y:1991 04 1991 INSTALL TIMERS AND/OR THERMOSTATS $458 $750 Not Implemented
WI0118 # 01 Y:1991 01 1991 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $22,344 $0 Implemented
WI0118 # 02 Y:1991 02 1991 INSTALL TIMERS AND/OR THERMOSTATS $11,458 $200 Implemented
WI0118 # 03 Y:1991 03 1991 INSTALL TIMERS AND/OR THERMOSTATS $3,546 $200 Implemented
WI0118 # 04 Y:1991 04 1991 INSTALL STORM WINDOWS AND DOORS $6,299 $24,394 Implemented
WI0118 # 05 Y:1991 05 1991 INSULATE BARE EQUIPMENT $256 $225 Implemented
WI0118 # 06 Y:1991 06 1991 USE DEMAND CONTROLLER OR LOAD SHEDDER $6,972 $10,000 Implemented
WI0118 # 07 Y:1991 07 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,835 $12,207 Implemented
WI0118 # 08 Y:1991 08 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $879 $2,340 Implemented
WI0118 # 09 Y:1991 09 1991 INSTALL SET-BACK TIMERS $470 $200 Implemented
WI0118 # 10 Y:1991 10 1991 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,614 $5,000 Implemented
WI0118 # 11 Y:1991 11 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,059 $0 Implemented
WI0118 # 12 Y:1991 12 1991 IMPROVE LUBRICATION PRACTICES $968 $0 Implemented