IAC logo
IAC Assessment: CO0292
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0292
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1994
Principal Product Injection molded metal parts
NAICS n/a
SIC 3499 - Fabricated Metal Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 140
Plant Area (Sq.Ft.) 40,000
Annual Production 9,600,000 Pieces
Production Hrs. Annual 6,000
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $197,140 5,251,759 kWh $0.04
Natural Gas $2,290 389 MMBtu $5.89
TOTAL ENERGY COSTS $199,430
RECOMMENDED SAVINGS* $11,290 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,780
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,990
Cost:
$4,690
$2,990 79,719 - - - - $2,990
79,719
kWh
-
-
MMBtu
-
-
$
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$1,930
Cost:
$2,400
- - - - $1,930 - -
-
kWh
-
-
MMBtu
$1,930
-
$
03: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$1,860
Cost:
$250
- - - - $1,860 - -
-
kWh
-
-
MMBtu
$1,860
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,630
Cost:
$3,840
$1,630 43,376 - - - - $1,630
43,376
kWh
-
-
MMBtu
-
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,150
Cost:
$4,660
$1,150 30,481 - - - - $1,150
30,481
kWh
-
-
MMBtu
-
-
$
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$910
Cost:
$2,080
$910 24,326 - - - - $910
24,326
kWh
-
-
MMBtu
-
-
$
07: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$460
Cost:
$300
$290 19,930 $170 29 - - $290
19,930
kWh
$170
29
MMBtu
-
-
$
08: 2.2511 INSULATE BARE EQUIPMENT Savings:
$360
Cost:
$610
$360 8,499 - - - - $360
8,499
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$11,290
Cost:
$18,830
$7,330 206,331 $170 29 $3,790 - $7,330
206,331
kWh
$170
29
MMBtu
$3,790
-
$
TOTAL IMPLEMENTED Savings:
$9,780
Cost:
$13,560
$5,820 167,351 $170 29 $3,790 - $5,820
167,351
kWh
$170
29
MMBtu
$3,790
-
$