IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,117

matching recommendations
Reset
SIC 3499 Fabricated Metal Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0200 # 02 Y:2021 02 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,955 $0 Implemented
DL0200 # 03 Y:2021 03 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,899 $200 Not Implemented
DL0200 # 04 Y:2021 04 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $1,182 $0 Implemented
DL0200 # 05 Y:2021 05 2021 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $9,055 $3,275 Not Implemented
DL0200 # 06 Y:2021 06 2021 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $30,035 $121,361 Implemented
DL0200 # 07 Y:2021 07 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $16,430 $36,000 Not Implemented
DL0200 # 08 Y:2021 08 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $75,171 $186,000 Not Implemented
DL0200 # 09 Y:2021 09 2021 USE HEAT PUMP FOR SPACE CONDITIONING $3,788 $5,060 Not Implemented
IC0254 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,289 $19,578 Not Implemented
IC0254 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,303 $4,300 Not Implemented
IC0254 # 03 Y:2022 03 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,568 $1,800 Not Implemented
IC0254 # 04 Y:2022 04 2022 INSTALL EFFICIENT RECTIFIERS $111,422 $1,500,000 Not Implemented
NL0054 # 01 Y:2021 01 2021 OPTIMIZE PLANT POWER FACTOR $16,506 $12,500 Not Implemented
NL0054 # 02 Y:2021 02 2021 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $8,000 $16,000 Not Implemented
NL0054 # 03 Y:2021 03 2021 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $7,166 $12,910 Not Implemented
NL0054 # 04 Y:2021 04 2021 RECOVER WASTE HEAT FROM EQUIPMENT $6,837 $18,456 Not Implemented
NL0054 # 05 Y:2021 05 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,098 $4,000 Not Implemented
NL0054 # 06 Y:2021 06 2021 ISOLATE HOT OR COLD EQUIPMENT $3,823 $1,018 Not Implemented
NL0054 # 07 Y:2021 07 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,528 $7,371 Not Implemented
NL0054 # 08 Y:2021 08 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,217 $1,920 Not Implemented
NL0054 # 09 Y:2021 09 2021 RECOVER AND REUSE WASTE MATERIAL $1,876 $6,000 Not Implemented
OK1041 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,337 $28,697 Implemented
OK1041 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,223 $1,690 Implemented
OK1041 # 03 Y:2021 03 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $896 $1,927 Implemented
OK1041 # 04 Y:2021 04 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $180 $0 Not Implemented