IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
Reset
SIC 3499 Fabricated Metal Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0206 # 05 Y:2019 05 2019 INSULATE BARE EQUIPMENT $7,065 $8,101 Implemented
UA0206 # 04 Y:2019 04 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $66,257 $100,000 Not Implemented
UA0206 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,768 $500 Not Implemented
UA0206 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,544 $1,372 Implemented
UA0206 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,997 $12,406 Not Implemented
UA0102 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,113 $4,070 Not Implemented
UA0102 # 10 Y:2013 10 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $3,808 $295 Implemented
UA0102 # 09 Y:2013 09 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,882 $5,695 Implemented
UA0102 # 08 Y:2013 08 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $13,771 $1,600 Not Implemented
UA0102 # 07 Y:2013 07 2013 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $5,742 $4,348 Not Implemented
UA0102 # 06 Y:2013 06 2013 INSTALL TIMERS AND/OR THERMOSTATS $9,708 $336 Implemented
UA0102 # 05 Y:2013 05 2013 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $20,898 $56,750 Implemented
UA0102 # 03 Y:2013 03 2013 INSTALL OCCUPANCY SENSORS $2,868 $3,530 Implemented
UA0102 # 02 Y:2013 02 2013 DISCONNECT BALLASTS $9,077 $2,400 Not Implemented
UA0102 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $50,854 $94,049 Implemented
UA0031 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,812 $41,878 Implemented
UA0031 # 08 Y:2009 08 2009 INSULATE BARE EQUIPMENT $350 $610 Implemented
UA0031 # 07 Y:2009 07 2009 RECOVER WASTE HEAT FROM EQUIPMENT $3,782 $1,385 Not Implemented
UA0031 # 06 Y:2009 06 2009 UPGRADE CONTROLS ON COMPRESSORS $1,573 $300 Not Implemented
UA0031 # 05 Y:2009 05 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,910 $1,500 Implemented
UA0031 # 04 Y:2009 04 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,868 $0 Not Implemented
UA0031 # 03 Y:2009 03 2009 INSTALL TIMERS AND/OR THERMOSTATS $2,044 $510 Implemented
UA0031 # 02 Y:2009 02 2009 USE PHOTOCELL CONTROLS $3,768 $1,894 Not Implemented