Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

29

matching recommendations
Reset
SIC 3499 Fabricated Metal Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NV0140 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,840 $800 Implemented
NV0140 # 03 Y:1999 03 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,509 $4,692 Implemented
NV0140 # 04 Y:1999 04 1999 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $556 $1,360 Not Implemented
NV0140 # 05 Y:1999 05 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $2,041 $0 Not Implemented
NV0140 # 01 Y:1999 01 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $110 $52 Not Implemented
SD0218 # 06 Y:1999 06 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $32,441 $102,000 Not Implemented
SD0218 # 05 Y:1999 05 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $49,560 $10,000 Not Implemented
SD0218 # 04 Y:1999 04 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $40,547 $65,000 Not Implemented
SD0218 # 03 Y:1999 03 1999 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM $39,599 $12,550 Not Implemented
SD0218 # 02 Y:1999 02 1999 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $62,663 $2,000 Not Implemented
SD0218 # 01 Y:1999 01 1999 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,815 $240 Implemented
SD0218 # 07 Y:1999 07 1999 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $25,085 $18,000 Not Implemented
SD0218 # 08 Y:1999 08 1999 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,000 $0 Implemented
SD0218 # 09 Y:1999 09 1999 CONVERT TO AQUEOUS CLEANING SYSTEM $2,926 $1,000 Not Implemented
SD0217 # 10 Y:1999 10 1999 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,680 $0 Not Implemented
SD0217 # 11 Y:1999 11 1999 CONVERT TO ELECTROSTATIC POWDER COATING $147,960 $10,000 Implemented
SD0217 # 09 Y:1999 09 1999 TURN OFF EQUIPMENT WHEN NOT IN USE $9,689 $1,195 Not Implemented
SD0217 # 13 Y:1999 13 1999 $12,000 $21,920 Not Implemented
SD0217 # 08 Y:1999 08 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,136 $400 Implemented
SD0217 # 07 Y:1999 07 1999 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $6,059 $1,000 Not Implemented
SD0217 # 06 Y:1999 06 1999 INSTALL SKYLIGHTS $520 $1,380 Not Implemented
SD0217 # 05 Y:1999 05 1999 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,938 $3,800 Not Implemented
SD0217 # 04 Y:1999 04 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,614 $500 Implemented
SD0217 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,351 $300 Not Implemented
SD0217 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $953 $2,268 Not Implemented