IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
Reset
SIC 3499 Fabricated Metal Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KS2209 # 08 Y:2022 08 2022 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $79,738 $627,000 Not Implemented
KS2209 # 07 Y:2022 07 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $77,094 $526,518 Implemented
KS2209 # 06 Y:2022 06 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,163 $34,256 Implemented
KS2209 # 05 Y:2022 05 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,610 $1,085 Not Implemented
KS2209 # 04 Y:2022 04 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,315 $60 Not Implemented
KS2209 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,552 $5,960 Not Implemented
KS2209 # 02 Y:2022 02 2022 PAY UTILITY BILLS ON TIME $593 $0 Implemented
KS2209 # 01 Y:2022 01 2022 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $24,875 $1,600 Implemented
GT0902 # 03 Y:2017 03 2017 INSULATE BARE EQUIPMENT $50 $197 Implemented
GT0902 # 02 Y:2017 02 2017 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $19,872 $6,000 Not Implemented
GT0902 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $20,435 $6,000 Not Implemented
GT0658 # 08 Y:1999 08 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,363 $3,000 Not Implemented
GT0658 # 07 Y:1999 07 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,316 $2,398 Not Implemented
GT0658 # 06 Y:1999 06 1999 INSTALL TIMERS AND/OR THERMOSTATS $777 $600 Implemented
GT0658 # 05 Y:1999 05 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $216 $0 Not Implemented
GT0658 # 04 Y:1999 04 1999 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,468 $200 Implemented
GT0658 # 03 Y:1999 03 1999 PAY UTILITY BILLS ON TIME $1,258 $0 Implemented
GT0658 # 02 Y:1999 02 1999 METER WASTE WATER $1,276 $500 Implemented
GT0658 # 01 Y:1999 01 1999 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $742 $0 Implemented
GT0647 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,309 $3,080 Implemented
GT0647 # 05 Y:1998 05 1998 INSTALL AUTOMATIC PACKING EQUIPMENT $2,260 $3,125 Not Implemented
GT0647 # 04 Y:1998 04 1998 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $430 $1,992 Not Implemented
GT0647 # 03 Y:1998 03 1998 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $860 $4,625 Not Implemented
GT0647 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $645 $2,200 Implemented