Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
33
matching recommendationsSIC | 3499 | Fabricated Metal Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0307 # 08 Y:2004 | 08 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,767 | $53 | Implemented |
WV0307 # 07 Y:2004 | 07 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,956 | $1,260 | Not Implemented |
WV0307 # 06 Y:2004 | 06 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,120 | $600 | Not Implemented |
WV0307 # 05 Y:2004 | 05 | 2004 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $2,255 | $1,505 | Not Implemented |
WV0307 # 04 Y:2004 | 04 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,891 | $4,040 | Not Implemented |
WV0307 # 14 Y:2004 | 14 | 2004 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $1,224 | $140 | Implemented |
WV0307 # 03 Y:2004 | 03 | 2004 | ISOLATE HOT OR COLD EQUIPMENT | $3,113 | $755 | Implemented |
WV0307 # 02 Y:2004 | 02 | 2004 | MINIMIZE WATER USAGE | $9,168 | $7,800 | Not Implemented |
WV0307 # 12 Y:2004 | 12 | 2004 | USE OPTIMUM THICKNESS INSULATION | $278 | $380 | Implemented |
WV0307 # 01 Y:2004 | 01 | 2004 | USE RADIANT HEATER FOR SPOT HEATING | $33,386 | $16,600 | Not Implemented |
WV0307 # 09 Y:2004 | 09 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,177 | $210 | Implemented |
WV0307 # 10 Y:2004 | 10 | 2004 | DEVELOP A REPAIR/REPLACE POLICY | $1,513 | $271 | Implemented |
WV0307 # 13 Y:2004 | 13 | 2004 | INSULATE BARE EQUIPMENT | $262 | $260 | Implemented |
WV0307 # 15 Y:2004 | 15 | 2004 | ELIMINATE PRACTICE OF MIXING WASTE STREAMS | $75 | $0 | Not Implemented |
WV0307 # 11 Y:2004 | 11 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $903 | $0 | Implemented |
UD0688 # 14 Y:2004 | 14 | 2004 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $2,460 | $0 | Implemented |
UD0688 # 13 Y:2004 | 13 | 2004 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $2,840 | $0 | Implemented |
UD0688 # 12 Y:2004 | 12 | 2004 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $3,670 | $6,000 | Not Implemented |
UD0688 # 11 Y:2004 | 11 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,745 | $470 | Implemented |
UD0688 # 09 Y:2004 | 09 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $5,165 | $6,370 | Implemented |
UD0688 # 08 Y:2004 | 08 | 2004 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $10,000 | $1,040 | Implemented |
UD0688 # 06 Y:2004 | 06 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,875 | $7,400 | Not Implemented |
UD0688 # 05 Y:2004 | 05 | 2004 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $12,457 | $31,250 | Implemented |
UD0688 # 04 Y:2004 | 04 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,315 | $40,500 | Not Implemented |
UD0688 # 03 Y:2004 | 03 | 2004 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $31,450 | $7,250 | Implemented |