IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

47

matching recommendations
Reset
SIC 3499 Fabricated Metal Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ST0011 # 03 Y:1984 03 1984 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $1,083 $190 Implemented
ST0011 # 01 Y:1984 01 1984 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,259 $0 Implemented
ST0011 # 08 Y:1984 08 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $869 $435 Implemented
ST0011 # 06 Y:1984 06 1984 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $93 $45 Implemented
ST0011 # 07 Y:1984 07 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,210 $56 Implemented
ST0011 # 04 Y:1984 04 1984 INSTALL / REPAIR INSULATION ON STEAM LINES $2,107 $2,290 Implemented
ST0011 # 02 Y:1984 02 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $148 $537 Not Implemented
ST0011 # 09 Y:1984 09 1984 RECOVER WASTE HEAT FROM EQUIPMENT $668 $500 Implemented
ST0011 # 05 Y:1984 05 1984 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $138 $0 Implemented
LT0008 # 03 Y:1984 03 1984 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $452 $375 Implemented
LT0008 # 02 Y:1984 02 1984 COVER OPEN TANKS $134 $204 Not Implemented
LT0008 # 01 Y:1984 01 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $380 $300 Implemented
KU0135 # 22 Y:1984 22 1984 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $368 $10 Implemented
KU0135 # 19 Y:1984 19 1984 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $905 $300 Implemented
KU0135 # 20 Y:1984 20 1984 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $496 $400 Not Implemented
KU0135 # 15 Y:1984 15 1984 IMPROVE LUBRICATION PRACTICES $1,143 $25 Not Implemented
OK0152 # 01 Y:1984 01 1984 INSTALL TIMERS AND/OR THERMOSTATS $146 $250 Not Implemented
KU0135 # 14 Y:1984 14 1984 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,763 $3,100 Implemented
KU0135 # 13 Y:1984 13 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,886 $78 Implemented
KU0135 # 11 Y:1984 11 1984 INSTALL AUTOMATIC STACK DAMPER $1,487 $1,300 Not Implemented
KU0135 # 09 Y:1984 09 1984 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $4,203 $100 Implemented
KU0135 # 08 Y:1984 08 1984 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $4,591 $7,800 Not Implemented
KU0135 # 06 Y:1984 06 1984 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $2,809 $3,750 Not Implemented
KU0135 # 05 Y:1984 05 1984 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,516 $2,774 Not Implemented
KU0135 # 03 Y:1984 03 1984 INSTALL TIMERS AND/OR THERMOSTATS $194 $0 Implemented