Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
47
matching recommendationsSIC | 3499 | Fabricated Metal Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
ST0011 # 09 Y:1984 | 09 | 1984 | RECOVER WASTE HEAT FROM EQUIPMENT | $668 | $500 | Implemented |
ST0011 # 08 Y:1984 | 08 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $869 | $435 | Implemented |
ST0011 # 07 Y:1984 | 07 | 1984 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,210 | $56 | Implemented |
ST0011 # 06 Y:1984 | 06 | 1984 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $93 | $45 | Implemented |
ST0011 # 05 Y:1984 | 05 | 1984 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $138 | $0 | Implemented |
ST0011 # 04 Y:1984 | 04 | 1984 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,107 | $2,290 | Implemented |
ST0011 # 03 Y:1984 | 03 | 1984 | REPLACE BROKEN WINDOWS AND/OR WINDOW SASH | $1,083 | $190 | Implemented |
ST0011 # 02 Y:1984 | 02 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $148 | $537 | Not Implemented |
ST0011 # 01 Y:1984 | 01 | 1984 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $4,259 | $0 | Implemented |
LT0008 # 03 Y:1984 | 03 | 1984 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $452 | $375 | Implemented |
LT0008 # 02 Y:1984 | 02 | 1984 | COVER OPEN TANKS | $134 | $204 | Not Implemented |
LT0008 # 01 Y:1984 | 01 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $380 | $300 | Implemented |
KU0135 # 10 Y:1984 | 10 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,389 | $5,000 | Implemented |
OK0152 # 01 Y:1984 | 01 | 1984 | INSTALL TIMERS AND/OR THERMOSTATS | $146 | $250 | Not Implemented |
OK0152 # 02 Y:1984 | 02 | 1984 | RECOVER WASTE HEAT FROM EQUIPMENT | $196 | $530 | Implemented |
OK0152 # 03 Y:1984 | 03 | 1984 | USE WATER ON AIR CONDITIONING EXCHANGER TO IMPROVE HEAT TRANSFER AND INCREASE AIR CONDITIONER EFFICIENCY | $292 | $480 | Implemented |
OK0152 # 04 Y:1984 | 04 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $292 | $134 | Implemented |
OK0152 # 05 Y:1984 | 05 | 1984 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $204 | $0 | Implemented |
OK0152 # 06 Y:1984 | 06 | 1984 | INSTALL SET-BACK TIMERS | $409 | $0 | Not Implemented |
OK0152 # 07 Y:1984 | 07 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $117 | $124 | Implemented |
OK0152 # 08 Y:1984 | 08 | 1984 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $58 | $58 | Implemented |
KU0135 # 15 Y:1984 | 15 | 1984 | IMPROVE LUBRICATION PRACTICES | $1,143 | $25 | Not Implemented |
KU0135 # 09 Y:1984 | 09 | 1984 | CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS | $4,203 | $100 | Implemented |
KU0135 # 08 Y:1984 | 08 | 1984 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $4,591 | $7,800 | Not Implemented |
KU0135 # 07 Y:1984 | 07 | 1984 | IMPROVE LUBRICATION PRACTICES | $6,508 | $2,250 | Not Implemented |