IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

45

matching recommendations
Reset
SIC 3499 Fabricated Metal Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0222 # 03 Y:1994 03 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,282 $640 Not Implemented
WI0222 # 04 Y:1994 04 1994 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,038 $850 Implemented
WI0222 # 01 Y:1994 01 1994 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $2,539 $0 Not Implemented
WI0222 # 02 Y:1994 02 1994 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $1,553 $1,500 Implemented
WI0222 # 06 Y:1994 06 1994 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $444 $0 Implemented
WI0222 # 07 Y:1994 07 1994 INSTALL TIMERS AND/OR THERMOSTATS $282 $600 Not Implemented
WI0222 # 08 Y:1994 08 1994 COVER OPEN TANKS $418 $77 Not Implemented
WI0222 # 09 Y:1994 09 1994 INSULATE BARE EQUIPMENT $226 $101 Not Implemented
WI0222 # 05 Y:1994 05 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $836 $0 Not Implemented
NC0038 # 05 Y:1994 05 1994 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $705 $1,624 Not Implemented
NC0038 # 08 Y:1994 08 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,154 $2,128 Implemented
NC0038 # 07 Y:1994 07 1994 INSULATE BARE EQUIPMENT $9,420 $1,500 Implemented
NC0038 # 04 Y:1994 04 1994 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,504 $8,400 Not Implemented
NC0038 # 06 Y:1994 06 1994 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $11,775 $7,000 Implemented
NC0038 # 01 Y:1994 01 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,128 $450 Implemented
NC0038 # 03 Y:1994 03 1994 DIRECT WARMEST AIR TO COMBUSTION INTAKE $989 $980 Not Implemented
NC0038 # 02 Y:1994 02 1994 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $6,058 $800 Implemented
ME0137 # 06 Y:1994 06 1994 REDUCE FLUID FLOW RATES $1,088 $1,010 Not Implemented
ME0137 # 07 Y:1994 07 1994 RECOVER WASTE HEAT FROM EQUIPMENT $6,915 $30,000 Not Implemented
ME0137 # 01 Y:1994 01 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $42,534 $50,000 Not Implemented
ME0137 # 02 Y:1994 02 1994 USE OPTIMUM THICKNESS INSULATION $22,500 $4,500 Not Implemented
ME0137 # 03 Y:1994 03 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $35,300 $70,000 Not Implemented
ME0137 # 04 Y:1994 04 1994 OPTIMIZE PLANT POWER FACTOR $9,485 $9,080 Not Implemented
ME0137 # 05 Y:1994 05 1994 METER WASTE WATER $18,700 $1,350 Not Implemented
BD0009 # 05 Y:1994 05 1994 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $14,608 $1,500 Not Implemented