Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
45
matching recommendationsSIC | 3499 | Fabricated Metal Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WI0222 # 03 Y:1994 | 03 | 1994 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,282 | $640 | Not Implemented |
WI0222 # 04 Y:1994 | 04 | 1994 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,038 | $850 | Implemented |
WI0222 # 01 Y:1994 | 01 | 1994 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $2,539 | $0 | Not Implemented |
WI0222 # 02 Y:1994 | 02 | 1994 | REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY | $1,553 | $1,500 | Implemented |
WI0222 # 06 Y:1994 | 06 | 1994 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $444 | $0 | Implemented |
WI0222 # 07 Y:1994 | 07 | 1994 | INSTALL TIMERS AND/OR THERMOSTATS | $282 | $600 | Not Implemented |
WI0222 # 08 Y:1994 | 08 | 1994 | COVER OPEN TANKS | $418 | $77 | Not Implemented |
WI0222 # 09 Y:1994 | 09 | 1994 | INSULATE BARE EQUIPMENT | $226 | $101 | Not Implemented |
WI0222 # 05 Y:1994 | 05 | 1994 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $836 | $0 | Not Implemented |
NC0038 # 05 Y:1994 | 05 | 1994 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $705 | $1,624 | Not Implemented |
NC0038 # 08 Y:1994 | 08 | 1994 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,154 | $2,128 | Implemented |
NC0038 # 07 Y:1994 | 07 | 1994 | INSULATE BARE EQUIPMENT | $9,420 | $1,500 | Implemented |
NC0038 # 04 Y:1994 | 04 | 1994 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,504 | $8,400 | Not Implemented |
NC0038 # 06 Y:1994 | 06 | 1994 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $11,775 | $7,000 | Implemented |
NC0038 # 01 Y:1994 | 01 | 1994 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,128 | $450 | Implemented |
NC0038 # 03 Y:1994 | 03 | 1994 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $989 | $980 | Not Implemented |
NC0038 # 02 Y:1994 | 02 | 1994 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $6,058 | $800 | Implemented |
ME0137 # 06 Y:1994 | 06 | 1994 | REDUCE FLUID FLOW RATES | $1,088 | $1,010 | Not Implemented |
ME0137 # 07 Y:1994 | 07 | 1994 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,915 | $30,000 | Not Implemented |
ME0137 # 01 Y:1994 | 01 | 1994 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $42,534 | $50,000 | Not Implemented |
ME0137 # 02 Y:1994 | 02 | 1994 | USE OPTIMUM THICKNESS INSULATION | $22,500 | $4,500 | Not Implemented |
ME0137 # 03 Y:1994 | 03 | 1994 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $35,300 | $70,000 | Not Implemented |
ME0137 # 04 Y:1994 | 04 | 1994 | OPTIMIZE PLANT POWER FACTOR | $9,485 | $9,080 | Not Implemented |
ME0137 # 05 Y:1994 | 05 | 1994 | METER WASTE WATER | $18,700 | $1,350 | Not Implemented |
BD0009 # 05 Y:1994 | 05 | 1994 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $14,608 | $1,500 | Not Implemented |