Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
52
matching recommendationsSIC | 3499 | Fabricated Metal Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0079 # 06 Y:2011 | 06 | 2011 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $1,937 | $0 | Implemented |
TT0079 # 08 Y:2011 | 08 | 2011 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $4,584 | $0 | Not Implemented |
TT0079 # 07 Y:2011 | 07 | 2011 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $5,691 | $0 | Not Implemented |
TT0079 # 01 Y:2011 | 01 | 2011 | DISCONNECT BALLASTS | $508 | $0 | Implemented |
TT0079 # 02 Y:2011 | 02 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $336 | $0 | Implemented |
TT0079 # 03 Y:2011 | 03 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $205 | $0 | Implemented |
TT0079 # 04 Y:2011 | 04 | 2011 | INSTALL OCCUPANCY SENSORS | $1,618 | $0 | Not Implemented |
TT0079 # 05 Y:2011 | 05 | 2011 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $631 | $0 | Not Implemented |
UD0841 # 11 Y:2011 | 11 | 2011 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $65,429 | $1,000 | Not Implemented |
UD0841 # 07 Y:2011 | 07 | 2011 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $22,760 | $500 | Not Implemented |
UD0841 # 10 Y:2011 | 10 | 2011 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $42,803 | $110,624 | Implemented |
UD0841 # 09 Y:2011 | 09 | 2011 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $1,228 | $750 | Not Implemented |
UD0841 # 15 Y:2011 | 15 | 2011 | ISOLATE HOT OR COLD EQUIPMENT | $33,356 | $2,000 | Implemented |
UD0841 # 16 Y:2011 | 16 | 2011 | INSTALL AUTOMATIC STACK DAMPER | $20,178 | $500 | Not Implemented |
UD0841 # 17 Y:2011 | 17 | 2011 | INSTALL AUTOMATIC STACK DAMPER | $20,941 | $600 | Implemented |
UD0841 # 18 Y:2011 | 18 | 2011 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,133 | $2,098 | Implemented |
UD0841 # 19 Y:2011 | 19 | 2011 | REDUCE VENTILATION AIR | $174,913 | $242,291 | Not Implemented |
UD0841 # 20 Y:2011 | 20 | 2011 | USE RADIANT HEATER FOR SPOT HEATING | $4,098 | $17,940 | Not Implemented |
UD0841 # 14 Y:2011 | 14 | 2011 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $64,796 | $20,000 | Implemented |
UD0841 # 06 Y:2011 | 06 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $29,362 | $500 | Implemented |
UD0841 # 05 Y:2011 | 05 | 2011 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $43,664 | $0 | Implemented |
UD0841 # 04 Y:2011 | 04 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,101 | $30,000 | Implemented |
UD0841 # 03 Y:2011 | 03 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $50,283 | $40,000 | Implemented |
UD0841 # 02 Y:2011 | 02 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $88,915 | $80,000 | Implemented |
UD0841 # 01 Y:2011 | 01 | 2011 | OPTIMIZE PLANT POWER FACTOR | $8,191 | $20,000 | Not Implemented |