Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
53
matching recommendationsSIC | 3499 | Fabricated Metal Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0093 # 01 Y:2012 | 01 | 2012 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $7,140 | $100 | Implemented |
DL0093 # 02 Y:2012 | 02 | 2012 | USE RADIANT HEATER FOR SPOT HEATING | $2,870 | $818 | Not Implemented |
DL0093 # 03 Y:2012 | 03 | 2012 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,360 | $50 | Not Implemented |
DL0093 # 04 Y:2012 | 04 | 2012 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $1,680 | $5,000 | Not Implemented |
DL0093 # 05 Y:2012 | 05 | 2012 | REDUCE VENTILATION AIR | $1,102 | $600 | Not Implemented |
DL0093 # 06 Y:2012 | 06 | 2012 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $940 | $230 | Not Implemented |
DL0093 # 07 Y:2012 | 07 | 2012 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $360 | $20 | Not Implemented |
DL0093 # 08 Y:2012 | 08 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $974 | $480 | Implemented |
DL0093 # 09 Y:2012 | 09 | 2012 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $480 | $425 | Not Implemented |
OK0830 # 01 Y:2012 | 01 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,255 | $1,300 | Implemented |
OK0830 # 04 Y:2012 | 04 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $340 | $470 | Implemented |
OK0830 # 10 Y:2012 | 10 | 2012 | INSTALL SET-BACK TIMERS | $1,870 | $378 | Implemented |
OK0830 # 11 Y:2012 | 11 | 2012 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $1,434 | $1,170 | Implemented |
OK0830 # 08 Y:2012 | 08 | 2012 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $2,673 | $4,950 | Not Implemented |
OK0830 # 09 Y:2012 | 09 | 2012 | INSTALL SET-BACK TIMERS | $1,626 | $2,310 | Not Implemented |
OK0830 # 02 Y:2012 | 02 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,339 | $1,378 | Not Implemented |
OK0830 # 06 Y:2012 | 06 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,068 | $8,256 | Implemented |
OK0830 # 03 Y:2012 | 03 | 2012 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $565 | $1,540 | Implemented |
OK0830 # 05 Y:2012 | 05 | 2012 | INSTALL OCCUPANCY SENSORS | $152 | $1,744 | Not Implemented |
OK0830 # 07 Y:2012 | 07 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,847 | $19,241 | Not Implemented |
NC0450 # 05 Y:2012 | 05 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,286 | $973 | Implemented |
NC0450 # 07 Y:2012 | 07 | 2012 | ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS | $113,534 | $25,000 | Implemented |
NC0450 # 08 Y:2012 | 08 | 2012 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $105,000 | $40,000 | Implemented |
NC0450 # 09 Y:2012 | 09 | 2012 | MAINTAIN CLEAN CONDITIONS BEFORE PAINTING | $38,389 | $30,000 | Implemented |
NC0450 # 10 Y:2012 | 10 | 2012 | IMPROVE SPACE COMFORT CONDITIONING | $4,739 | $8,000 | Not Implemented |