IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,093

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0102 # 04 Y:1987 04 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,315 $168 Implemented
UD0246 # 01 Y:1988 01 1988 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,261 $0 Implemented
UD0246 # 03 Y:1988 03 1988 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $19,946 $100,000 Implemented
UD0246 # 04 Y:1988 04 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,694 $32,400 Implemented
UD0246 # 05 Y:1988 05 1988 INSULATE BARE EQUIPMENT $4,414 $3,400 Implemented
AM0007 # 01 Y:1987 01 1987 OPTIMIZE PLANT POWER FACTOR $1,648 $5,000 Implemented
AM0007 # 03 Y:1987 03 1987 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $114 $0 Implemented
AM0007 # 04 Y:1987 04 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,212 $3,205 Implemented
AM0007 # 05 Y:1987 05 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,996 $2,146 Implemented
KU0232 # 01 Y:1987 01 1987 TURN OFF EQUIPMENT WHEN NOT IN USE $1,464 $0 Implemented
KU0232 # 03 Y:1987 03 1987 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $572 $100 Implemented
KU0232 # 04 Y:1987 04 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $170 $0 Implemented
KU0232 # 05 Y:1987 05 1987 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $158 $40 Implemented
KU0235 # 02 Y:1987 02 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,844 $0 Implemented
KU0235 # 03 Y:1987 03 1987 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,582 $400 Implemented
KU0235 # 04 Y:1987 04 1987 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,242 $4,000 Implemented
KU0235 # 10 Y:1987 10 1987 SHUT OFF PILOTS IN STANDBY EQUIPMENT $162 $0 Implemented
KU0236 # 01 Y:1987 01 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,730 $8,946 Implemented
KU0236 # 03 Y:1987 03 1987 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $1,055 $0 Implemented
KU0236 # 05 Y:1987 05 1987 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $725 $0 Implemented
KU0236 # 08 Y:1987 08 1987 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $582 $120 Implemented
KU0236 # 10 Y:1987 10 1987 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $172 $120 Implemented
UD0243 # 01 Y:1988 01 1988 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $12,000 $10,000 Implemented
UD0243 # 04 Y:1988 04 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,388 $600 Implemented
UD0243 # 05 Y:1988 05 1988 INSTALL TIMERS AND/OR THERMOSTATS $3,354 $1,200 Implemented