IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,093

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0172 # 07 Y:1985 07 1985 INSTALL TIMERS AND/OR THERMOSTATS $2,911 $600 Implemented
UD0160 # 01 Y:1985 01 1985 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $26,076 $20,000 Implemented
UD0160 # 02 Y:1985 02 1985 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $2,657 $2,000 Implemented
UD0160 # 03 Y:1985 03 1985 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $13,357 $1,400 Implemented
UD0160 # 04 Y:1985 04 1985 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $280 $200 Implemented
UD0160 # 05 Y:1985 05 1985 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,689 $0 Implemented
UD0160 # 06 Y:1985 06 1985 RECOVER WASTE HEAT FROM EQUIPMENT $1,825 $551 Implemented
UD0160 # 07 Y:1985 07 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,401 $7,500 Implemented
GT0255 # 01 Y:1985 01 1985 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $57 $57 Implemented
GT0255 # 02 Y:1985 02 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,238 $1,459 Implemented
GT0255 # 03 Y:1985 03 1985 UPGRADE OBSOLETE EQUIPMENT $539 $400 Implemented
GT0255 # 04 Y:1985 04 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,220 $400 Implemented
TN0240 # 01 Y:1985 01 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,237 $180 Implemented
TN0240 # 03 Y:1985 03 1985 INSTALL TIMERS AND/OR THERMOSTATS $2,349 $300 Implemented
UD0152 # 02 Y:1985 02 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $749 $99 Implemented
UD0148 # 01 Y:1985 01 1985 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,500 $300 Implemented
UD0148 # 02 Y:1985 02 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,111 $2,395 Implemented
ST0012 # 01 Y:1985 01 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,341 $40 Implemented
ST0012 # 02 Y:1985 02 1985 REDUCE VENTILATION AIR $935 $1,644 Implemented
ST0012 # 05 Y:1985 05 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $698 $537 Implemented
ST0012 # 06 Y:1985 06 1985 SHUT OFF PILOTS IN STANDBY EQUIPMENT $1,235 $0 Implemented
ST0012 # 07 Y:1985 07 1985 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $326 $0 Implemented
ST0012 # 08 Y:1985 08 1985 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,921 $80 Implemented
ST0012 # 10 Y:1985 10 1985 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $166 $80 Implemented
ST0016 # 01 Y:1985 01 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,538 $136 Implemented