Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
15,260
matching recommendationsSIC | 35 | Industrial Machinery And Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0361 # 03 Y:2024 | 03 | 2024 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $13,797 | $4,800 | n/a |
MZ0361 # 04 Y:2024 | 04 | 2024 | INSTALL OCCUPANCY SENSORS | $2,158 | $1,750 | n/a |
MZ0361 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $20,374 | $117,036 | n/a |
MZ0361 # 06 Y:2024 | 06 | 2024 | RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT | $45,827 | $6,720 | n/a |
MZ0361 # 07 Y:2024 | 07 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $41,882 | $33,744 | n/a |
MZ0361 # 08 Y:2024 | 08 | 2024 | MINIMIZE WATER USAGE | $71,580 | $385,388 | n/a |
MZ0361 # 09 Y:2024 | 09 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $322,316 | $3,602,500 | n/a |
OK1112 # 01 Y:2024 | 01 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $51,785 | $105,814 | n/a |
OK1112 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,481 | $488 | n/a |
OK1112 # 03 Y:2024 | 03 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $8,094 | $626 | n/a |
OK1112 # 04 Y:2024 | 04 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $15,199 | $0 | n/a |
OK1112 # 05 Y:2024 | 05 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $66,259 | $17,620 | n/a |
OK1112 # 06 Y:2024 | 06 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $681 | $100 | n/a |
OK1112 # 07 Y:2024 | 07 | 2024 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $52,088 | $38,766 | n/a |
UD1084 # 01 Y:2024 | 01 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,386 | $0 | n/a |
UD1084 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,258 | $1,235 | n/a |
UD1084 # 03 Y:2024 | 03 | 2024 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $3,871 | $6,080 | n/a |
UD1084 # 04 Y:2024 | 04 | 2024 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $47,804 | $143,413 | n/a |
UD1084 # 05 Y:2024 | 05 | 2024 | INSTALL OCCUPANCY SENSORS | $1,251 | $3,985 | n/a |
UD1084 # 06 Y:2024 | 06 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,134 | $3,775 | n/a |
UU0247 # 01 Y:2024 | 01 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $5,970 | $3,000 | n/a |
UU0247 # 02 Y:2024 | 02 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,770 | $9,500 | n/a |
UU0247 # 03 Y:2024 | 03 | 2024 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $200,000 | $717,040 | n/a |
UU0247 # 04 Y:2024 | 04 | 2024 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $1,060 | $1,950 | n/a |
UU0247 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $864 | $7,540 | n/a |