IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

336

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0482 # 04 Y:2016 04 2016 INSTALL OCCUPANCY SENSORS $738 $825 Not Implemented
BD0482 # 05 Y:2016 05 2016 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $507 $600 Not Implemented
BD0482 # 06 Y:2016 06 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $152 $184 Not Implemented
BD0482 # 07 Y:2016 07 2016 CONVERT TO ELECTROSTATIC POWDER COATING $186,807 $160,000 Implemented
UM0467 # 01 Y:2016 01 2016 INSTALL OCCUPANCY SENSORS $1,731 $1,080 n/a
UM0467 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $257 $1,170 n/a
UM0467 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,341 $1,946 n/a
UM0467 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,908 $7,823 n/a
UM0467 # 05 Y:2016 05 2016 COVER OPEN TANKS $4,591 $524 n/a
UM0467 # 06 Y:2016 06 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,544 $2,000 n/a
UM0467 # 07 Y:2016 07 2016 INSULATE BARE EQUIPMENT $56 $100 n/a
UM0467 # 08 Y:2016 08 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $1,938 $5,400 n/a
UM0467 # 09 Y:2016 09 2016 REUSE / RECYCLE/ SELL PAPER PRODUCTS $4,320 $7,050 n/a
LE0417 # 01 Y:2016 01 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,317 $46 Not Implemented
LE0417 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,844 $1,000 Implemented
LE0417 # 03 Y:2016 03 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $715 $500 Implemented
LE0417 # 04 Y:2016 04 2016 RECOVER WASTE HEAT FROM EQUIPMENT $1,687 $1,868 Not Implemented
LE0417 # 05 Y:2016 05 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,602 $25,000 Implemented
LE0417 # 06 Y:2016 06 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,120 $22,015 Implemented
LE0417 # 07 Y:2016 07 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,659 $62,300 Implemented
UM0465 # 01 Y:2016 01 2016 INSTALL OCCUPANCY SENSORS $3,158 $5,250 Not Implemented
UM0465 # 02 Y:2016 02 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,640 $2,000 Not Implemented
UM0465 # 03 Y:2016 03 2016 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $485 $1,029 Not Implemented
UM0465 # 04 Y:2016 04 2016 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,573 $0 Not Implemented
UM0465 # 05 Y:2016 05 2016 RECOVER WASTE HEAT FROM EQUIPMENT $1,361 $150 Not Implemented