IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

445

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0646 # 04 Y:1998 04 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,325 $5,000 Implemented
TN0646 # 05 Y:1998 05 1998 CONTRACT A WOOD PALLET RECYCLING COMPANY $2,880 $0 Implemented
TN0646 # 06 Y:1998 06 1998 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,600 $0 Not Implemented
OD0118 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,264 $4,586 Implemented
OD0118 # 02 Y:1998 02 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $45 $132 Implemented
OD0118 # 03 Y:1998 03 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $198 $400 Implemented
OD0118 # 04 Y:1998 04 1998 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,113 $210 Not Implemented
OD0118 # 05 Y:1998 05 1998 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $880 $420 Not Implemented
NC0144 # 01 Y:1998 01 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,673 $14,934 Not Implemented
NC0144 # 02 Y:1998 02 1998 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,664 $1,000 Implemented
NC0144 # 03 Y:1998 03 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,696 $12,000 Not Implemented
NC0144 # 04 Y:1998 04 1998 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,617 $4,731 Implemented
NC0144 # 05 Y:1998 05 1998 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $113 $200 Implemented
NC0144 # 06 Y:1998 06 1998 METER WASTE WATER $1,464 $200 Implemented
NC0144 # 07 Y:1998 07 1998 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $5,550 $2,700 Implemented
NC0144 # 08 Y:1998 08 1998 USE EVAPORATION TO CONCENTRATE MATERIAL $2,325 $12,000 Not Implemented
OD0097 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,814 $7,298 n/a
OD0097 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,074 $21,501 n/a
OD0097 # 03 Y:1997 03 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,885 $829 n/a
OD0097 # 04 Y:1997 04 1997 RECOVER WASTE HEAT FROM EQUIPMENT $1,355 $693 n/a
OD0097 # 05 Y:1997 05 1997 REDUCE VENTILATION AIR $3,070 $1,630 n/a
OD0097 # 06 Y:1997 06 1997 REPROCESS SPENT OILS ON SITE FOR RE-USE $471 $0 n/a
NC0117 # 01 Y:1997 01 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $271 $499 Implemented
NC0117 # 02 Y:1997 02 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $100 $111 Implemented
NC0117 # 03 Y:1997 03 1997 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $791 $140 Implemented