IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

618

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0496 # 03 Y:2005 03 2005 INSTALL TIMERS AND/OR THERMOSTATS $4,904 $0 Implemented
WI0496 # 04 Y:2005 04 2005 REPLACE CLOTH RAGS WITH PAPER TOWELS $3,540 $0 Not Implemented
WI0496 # 05 Y:2005 05 2005 MODIFY WORKLOAD $2,970 $0 Not Implemented
WI0496 # 06 Y:2005 06 2005 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $1,445 $2,000 Not Implemented
WI0496 # 07 Y:2005 07 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,397 $0 Not Implemented
WI0496 # 08 Y:2005 08 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $677 $1,280 Not Implemented
WI0477 # 01 Y:2004 01 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,743 $0 Not Implemented
WI0477 # 02 Y:2004 02 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,524 $855 Not Implemented
WI0477 # 03 Y:2004 03 2004 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $2,765 $605 Not Implemented
WI0477 # 04 Y:2004 04 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,817 $433 Not Implemented
WI0477 # 05 Y:2004 05 2004 INSTALL TIMERS AND/OR THERMOSTATS $923 $0 Not Implemented
WI0477 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $938 $0 Implemented
WI0477 # 07 Y:2004 07 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $582 $0 Not Implemented
WI0470 # 01 Y:2004 01 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,014 $26,070 Not Implemented
WI0470 # 02 Y:2004 02 2004 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $4,976 $28,750 Not Implemented
WI0470 # 03 Y:2004 03 2004 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,832 $0 Not Implemented
WI0470 # 04 Y:2004 04 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,353 $5,780 Implemented
WI0470 # 05 Y:2004 05 2004 INSTALL OCCUPANCY SENSORS $1,484 $896 Implemented
WI0470 # 06 Y:2004 06 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,293 $0 Implemented
WI0470 # 07 Y:2004 07 2004 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,075 $4,000 Not Implemented
WI0470 # 08 Y:2004 08 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $579 $0 Not Implemented
WI0467 # 01 Y:2004 01 2004 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $15,905 $15,000 Implemented
WI0467 # 02 Y:2004 02 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,050 $12,800 Not Implemented
WI0467 # 03 Y:2004 03 2004 INSTALL TIMERS AND/OR THERMOSTATS $2,729 $400 Implemented
WI0467 # 04 Y:2004 04 2004 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,231 $300 Implemented