Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Wisconsin, Milwaukee |
---|---|
Assessment Year | 2004 |
Principal Product | High Percision Cutting Tools |
NAICS | 333515 - Cutting Tool and Machine Tool Accessory Manufacturing |
SIC | 3541 - Machine Tools, Metal Cutting Types |
Sales | $50,000,000-$100,000,000 |
# of Employees | 260 |
Plant Area (Sq.Ft.) | 115,000 |
Annual Production | 2,600,000 Pieces |
Production Hrs. Annual | 7,200 |
Location (State) | WI |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $252,226 | 7,748,900 | kWh | $0.03 |
Electricity Demand | $152,511 | 16,611 | kW-months/year | $9.18 |
Electricity Fees | $69,539 | - | $ | - |
Natural Gas | $43,830 | 5,541 | MMBtu | $7.91 |
TOTAL ENERGY COSTS | $518,106 | |||
RECOMMENDED SAVINGS* | $30,606 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $5,130 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $14,014 Cost: $26,070 |
$9,532 | 278,712 | $4,482 | 464 | - | - |
$9,532 278,712 kWh |
$4,482 464 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7251 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF |
Savings: $4,976 Cost: $28,750 |
$2,964 | 86,668 | $2,012 | 240 | - | - |
$2,964 86,668 kWh |
$2,012 240 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA |
Savings: $4,832 Cost: - |
- | - | - | - | $4,832 | 610 |
- - kWh |
- - kW-months/year |
$4,832 610 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $2,353 Cost: $5,780 |
$2,353 | 68,789 | - | - | - | - |
$2,353 68,789 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $1,484 Cost: $896 |
$1,019 | 28,917 | $465 | 48 | - | - |
$1,019 28,917 kWh |
$465 48 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $1,293 Cost: - |
$879 | 25,718 | $414 | 42 | - | - |
$879 25,718 kWh |
$414 42 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE |
Savings: $1,075 Cost: $4,000 |
$731 | 21,384 | $344 | 35 | - | - |
$731 21,384 kWh |
$344 35 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $579 Cost: - |
- | - | $579 | 60 | - | - |
- - kWh |
$579 60 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $30,606 Cost: $65,496 |
$17,478 | 510,188 | $8,296 | 889 | $4,832 | 610 | $17,478 510,188 kWh |
$8,296 889 kW-months/year |
$4,832 610 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $5,130 Cost: $6,676 |
$4,251 | 123,424 | $879 | 90 | - | - | $4,251 123,424 kWh |
$879 90 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |