IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

15,265

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0059 # 04 Y:2015 04 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $744 $264 Not Implemented
BS0059 # 05 Y:2015 05 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $23,386 $9,729 Implemented
BS0059 # 06 Y:2015 06 2015 INSTALL OCCUPANCY SENSORS $178 $91 Not Implemented
BS0059 # 07 Y:2015 07 2015 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $368 $4,065 Not Implemented
BS0059 # 08 Y:2015 08 2015 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $25 $929 Not Implemented
AM0686 # 01 Y:2015 01 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $9,770 $0 Not Implemented
AM0686 # 02 Y:2015 02 2015 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,790 $0 Not Implemented
AM0686 # 03 Y:2015 03 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $895 $5 Not Implemented
AM0686 # 04 Y:2015 04 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,390 $5,700 Not Implemented
AM0686 # 05 Y:2015 05 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $455 $220 Not Implemented
AM0686 # 06 Y:2015 06 2015 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $12,685 $17,600 Not Implemented
AM0686 # 07 Y:2015 07 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,490 $500 Not Implemented
AM0686 # 08 Y:2015 08 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,915 $1,810 Not Implemented
AM0686 # 09 Y:2015 09 2015 PAY UTILITY BILLS ON TIME $1,789 $0 Not Implemented
CO0711 # 01 Y:2015 01 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,360 $620 n/a
CO0711 # 02 Y:2015 02 2015 INSULATE BARE EQUIPMENT $900 $960 n/a
CO0711 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $350 $340 n/a
CO0711 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,960 $15,540 n/a
IA0536 # 01 Y:2015 01 2015 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $12,942 $244 Implemented
IA0536 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,348 $332 Implemented
IA0536 # 03 Y:2015 03 2015 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $5,197 $20,000 Not Implemented
IA0536 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,930 $2,873 Implemented
IA0536 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,490 $6,563 Implemented
IA0536 # 06 Y:2015 06 2015 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $1,368 $4,943 Not Implemented
IA0536 # 07 Y:2015 07 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,311 $480 Not Implemented