IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

15,265

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0383 # 04 Y:2015 04 2015 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $6,133 $4,684 Not Implemented
SU0383 # 05 Y:2015 05 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $920 $849 Not Implemented
SU0383 # 06 Y:2015 06 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,072 $2,205 Not Implemented
SU0383 # 07 Y:2015 07 2015 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $218 $471 Implemented
SU0383 # 08 Y:2015 08 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $104 $256 Implemented
SU0383 # 09 Y:2015 09 2015 MINIMIZE WATER USAGE $3,332 $15,700 Not Implemented
BS0051 # 01 Y:2015 01 2015 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $15,523 $200 Not Implemented
BS0051 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,969 $3,393 Implemented
BS0051 # 03 Y:2015 03 2015 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $638 $259 Implemented
BS0051 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $396 $1,280 Implemented
BS0051 # 05 Y:2015 05 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $909 $15 Not Implemented
WV0503 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,355 $27,692 Not Implemented
WV0503 # 02 Y:2015 02 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $6,444 $22,500 Not Implemented
WV0503 # 03 Y:2015 03 2015 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,630 $5,700 Not Implemented
WV0503 # 04 Y:2015 04 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,899 $500 Implemented
WV0503 # 05 Y:2015 05 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,831 $374 Implemented
WV0503 # 06 Y:2015 06 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,499 $3,530 Implemented
WV0503 # 07 Y:2015 07 2015 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $915 $1,000 Implemented
WV0503 # 08 Y:2015 08 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $407 $448 Implemented
WV0503 # 09 Y:2015 09 2015 DEVELOP A REPAIR/REPLACE POLICY $283 $630 Implemented
WV0503 # 10 Y:2015 10 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $272 $1,250 Not Implemented
OK0905 # 01 Y:2015 01 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,534 $2,400 Not Implemented
OK0905 # 02 Y:2015 02 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $98 $77 Not Implemented
OK0905 # 03 Y:2015 03 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $146 $463 Not Implemented
OK0905 # 04 Y:2015 04 2015 RECOVER WASTE HEAT FROM EQUIPMENT $468 $1,220 Not Implemented