IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,195

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0837 # 08 Y:2011 08 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,623 $1,200 Not Implemented
UD0837 # 09 Y:2011 09 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $538 $75 Not Implemented
UD0837 # 10 Y:2011 10 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,017 $500 Not Implemented
UD0837 # 11 Y:2011 11 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $10,692 $25,000 Not Implemented
UD0837 # 12 Y:2011 12 2011 ISOLATE HOT OR COLD EQUIPMENT $2,952 $11,720 Not Implemented
UD0837 # 13 Y:2011 13 2011 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $2,991 $11,835 Not Implemented
UD0833 # 01 Y:2011 01 2011 INSTALL OCCUPANCY SENSORS $2,272 $300 Implemented
UD0833 # 02 Y:2011 02 2011 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,467 $25 Implemented
UD0833 # 03 Y:2011 03 2011 UPGRADE CONTROLS ON COMPRESSORS $24,064 $1,075 Not Implemented
UD0833 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,026 $500 Not Implemented
UD0833 # 05 Y:2011 05 2011 UPGRADE OBSOLETE EQUIPMENT $3,710 $12,661 Not Implemented
UD0833 # 06 Y:2011 06 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,343 $500 Implemented
UD0833 # 07 Y:2011 07 2011 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $11,144 $600 Not Implemented
UD0833 # 08 Y:2011 08 2011 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $7,523 $10,500 Not Implemented
UD0833 # 09 Y:2011 09 2011 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $5,553 $100 Not Implemented
UD0833 # 10 Y:2011 10 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $844 $50 Implemented
UD0833 # 11 Y:2011 11 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $83,814 $10,000 Not Implemented
UD0833 # 12 Y:2011 12 2011 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $37,935 $100 Implemented
UD0833 # 13 Y:2011 13 2011 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $21,754 $100 Not Implemented
UD0833 # 14 Y:2011 14 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,701 $20,000 Not Implemented
UD0833 # 15 Y:2011 15 2011 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,435 $100 Implemented
UD0833 # 16 Y:2011 16 2011 USE RADIANT HEATER FOR SPOT HEATING $1,061 $2,800 Not Implemented
UD0833 # 17 Y:2011 17 2011 USE SOLAR HEAT TO MAKE ELECTRICTY $23,107 $145,390 Not Implemented
WV0411 # 01 Y:2010 01 2010 REDESIGN PROCESS $11,522 $20,345 Not Implemented
WV0411 # 02 Y:2010 02 2010 RECOVER WASTE HEAT FROM EQUIPMENT $11,172 $6,123 Implemented