Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,195
matching recommendationsSIC | 35 | Industrial Machinery And Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0837 # 08 Y:2011 | 08 | 2011 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,623 | $1,200 | Not Implemented |
UD0837 # 09 Y:2011 | 09 | 2011 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $538 | $75 | Not Implemented |
UD0837 # 10 Y:2011 | 10 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,017 | $500 | Not Implemented |
UD0837 # 11 Y:2011 | 11 | 2011 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $10,692 | $25,000 | Not Implemented |
UD0837 # 12 Y:2011 | 12 | 2011 | ISOLATE HOT OR COLD EQUIPMENT | $2,952 | $11,720 | Not Implemented |
UD0837 # 13 Y:2011 | 13 | 2011 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $2,991 | $11,835 | Not Implemented |
UD0833 # 01 Y:2011 | 01 | 2011 | INSTALL OCCUPANCY SENSORS | $2,272 | $300 | Implemented |
UD0833 # 02 Y:2011 | 02 | 2011 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,467 | $25 | Implemented |
UD0833 # 03 Y:2011 | 03 | 2011 | UPGRADE CONTROLS ON COMPRESSORS | $24,064 | $1,075 | Not Implemented |
UD0833 # 04 Y:2011 | 04 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,026 | $500 | Not Implemented |
UD0833 # 05 Y:2011 | 05 | 2011 | UPGRADE OBSOLETE EQUIPMENT | $3,710 | $12,661 | Not Implemented |
UD0833 # 06 Y:2011 | 06 | 2011 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,343 | $500 | Implemented |
UD0833 # 07 Y:2011 | 07 | 2011 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $11,144 | $600 | Not Implemented |
UD0833 # 08 Y:2011 | 08 | 2011 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $7,523 | $10,500 | Not Implemented |
UD0833 # 09 Y:2011 | 09 | 2011 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $5,553 | $100 | Not Implemented |
UD0833 # 10 Y:2011 | 10 | 2011 | TURN OFF EQUIPMENT WHEN NOT IN USE | $844 | $50 | Implemented |
UD0833 # 11 Y:2011 | 11 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $83,814 | $10,000 | Not Implemented |
UD0833 # 12 Y:2011 | 12 | 2011 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $37,935 | $100 | Implemented |
UD0833 # 13 Y:2011 | 13 | 2011 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $21,754 | $100 | Not Implemented |
UD0833 # 14 Y:2011 | 14 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,701 | $20,000 | Not Implemented |
UD0833 # 15 Y:2011 | 15 | 2011 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,435 | $100 | Implemented |
UD0833 # 16 Y:2011 | 16 | 2011 | USE RADIANT HEATER FOR SPOT HEATING | $1,061 | $2,800 | Not Implemented |
UD0833 # 17 Y:2011 | 17 | 2011 | USE SOLAR HEAT TO MAKE ELECTRICTY | $23,107 | $145,390 | Not Implemented |
WV0411 # 01 Y:2010 | 01 | 2010 | REDESIGN PROCESS | $11,522 | $20,345 | Not Implemented |
WV0411 # 02 Y:2010 | 02 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $11,172 | $6,123 | Implemented |