IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

15,265

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0859 # 07 Y:2013 07 2013 RECOVER WASTE HEAT FROM EQUIPMENT $3,135 $3,356 Not Implemented
OK0859 # 08 Y:2013 08 2013 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $20,774 $7,707 Not Implemented
OK0859 # 09 Y:2013 09 2013 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $11,338 $4,600 Not Implemented
OK0859 # 10 Y:2013 10 2013 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $17,170 $30,000 Implemented
OK0859 # 11 Y:2013 11 2013 INSTALL SET-BACK TIMERS $1,753 $460 Not Implemented
OK0859 # 12 Y:2013 12 2013 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $3,487 $3,063 Not Implemented
OK0859 # 13 Y:2013 13 2013 REDUCE HEAT GAIN BY WINDOW TINTING $3,200 $6,500 Implemented
OK0859 # 14 Y:2013 14 2013 REDUCE HEAT GAIN BY WINDOW TINTING $372 $0 Implemented
OR0608 # 01 Y:2013 01 2013 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $32,340 $0 Implemented
OR0608 # 02 Y:2013 02 2013 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $107,138 $55,641 Implemented
OR0608 # 03 Y:2013 03 2013 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $125,546 $300,000 Not Implemented
OR0608 # 04 Y:2013 04 2013 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $11,970 $41,000 Not Implemented
OR0608 # 05 Y:2013 05 2013 INSULATE BARE EQUIPMENT $518 $135 Not Implemented
OR0608 # 06 Y:2013 06 2013 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $2,698 $1,220 Not Implemented
OR0608 # 07 Y:2013 07 2013 USE PHOTOCELL CONTROLS $658 $966 Not Implemented
MZ0115 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,884 $3,658 Not Implemented
MZ0115 # 02 Y:2013 02 2013 INSTALL OCCUPANCY SENSORS $3,448 $2,450 Not Implemented
MZ0115 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,027 $1,600 Implemented
MZ0115 # 04 Y:2013 04 2013 ELIMINATE/REDUCE AN OPERATION $11,784 $0 Implemented
MZ0115 # 05 Y:2013 05 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $42,874 $204,750 Implemented
MZ0115 # 06 Y:2013 06 2013 USE PHOTOCELL CONTROLS $2,832 $750 Not Implemented
MZ0115 # 07 Y:2013 07 2013 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $8,261 $750 Not Implemented
MZ0115 # 08 Y:2013 08 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,543 $1,160 Implemented
MZ0115 # 09 Y:2013 09 2013 RECOVER WASTE HEAT FROM EQUIPMENT $1,362 $1,500 Implemented
MZ0115 # 10 Y:2013 10 2013 CONDENSE OPERATION INTO ONE BUILDING $99,466 $35,000 Implemented