IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

15,265

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0099 # 04 Y:2013 04 2013 OPTIMIZE PLANT POWER FACTOR $19,434 $14,980 Not Implemented
UA0099 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,301 $5,000 Implemented
UA0099 # 06 Y:2013 06 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,883 $400 Not Implemented
NC0483 # 01 Y:2013 01 2013 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $240,743 $750,000 Not Implemented
NC0483 # 02 Y:2013 02 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,552 $69,000 Not Implemented
NC0483 # 03 Y:2013 03 2013 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $8,715 $20,000 Not Implemented
NC0483 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $80,247 $134,713 Implemented
NC0483 # 05 Y:2013 05 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,537 $18,520 Implemented
NC0483 # 06 Y:2013 06 2013 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $791 $50 Implemented
BD0422 # 01 Y:2013 01 2013 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $16,352 $400 Not Implemented
BD0422 # 02 Y:2013 02 2013 USE RADIANT HEATER FOR SPOT HEATING $11,658 $28,800 Not Implemented
BD0422 # 03 Y:2013 03 2013 USE SYNTHETIC LUBRICANT $4,219 $4,219 Not Implemented
BD0422 # 04 Y:2013 04 2013 INSTALL OCCUPANCY SENSORS $2,518 $3,225 Not Implemented
BD0422 # 05 Y:2013 05 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,187 $25 Not Implemented
BD0422 # 06 Y:2013 06 2013 USE SYNTHETIC LUBRICANT $633 $300 Not Implemented
BD0422 # 07 Y:2013 07 2013 RECOVER WASTE HEAT FROM EQUIPMENT $610 $1,000 Not Implemented
BD0422 # 08 Y:2013 08 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $530 $500 Not Implemented
BD0422 # 09 Y:2013 09 2013 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $17,739 $4,600 Not Implemented
MI0236 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,041 $1,660 Implemented
MI0236 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,939 $63,550 Implemented
MI0236 # 03 Y:2013 03 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $13,443 $1,800 Implemented
MI0236 # 04 Y:2013 04 2013 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $10,720 $80 Implemented
MI0236 # 05 Y:2013 05 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,825 $7,995 Not Implemented
MI0236 # 06 Y:2013 06 2013 INSTALL OCCUPANCY SENSORS $2,284 $400 Not Implemented
MI0236 # 07 Y:2013 07 2013 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $2,102 $447 Implemented