IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

15,265

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0816 # 10 Y:2011 10 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,037 $0 Implemented
OK0816 # 11 Y:2011 11 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,760 $1,338 Implemented
OK0816 # 12 Y:2011 12 2011 INSULATE BARE EQUIPMENT $1,893 $2,263 Not Implemented
MS0382 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $76,988 $223,560 Not Implemented
MS0382 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,473 $142 Implemented
MS0382 # 03 Y:2011 03 2011 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $14,805 $0 Implemented
MS0382 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,932 $480 Implemented
MS0382 # 05 Y:2011 05 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,936 $1,056 Not Implemented
MS0382 # 06 Y:2011 06 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,709 $17,527 Implemented
TT0075 # 01 Y:2011 01 2011 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $36,083 $42,000 Not Implemented
TT0075 # 02 Y:2011 02 2011 RECOVER WASTE HEAT FROM EQUIPMENT $109,802 $50,000 Not Implemented
TT0075 # 03 Y:2011 03 2011 RECOVER WASTE HEAT FROM EQUIPMENT $47,625 $21,000 Implemented
TT0075 # 04 Y:2011 04 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,202 $14,000 Implemented
TT0075 # 05 Y:2011 05 2011 INSTALL COMMON HEADER ON COMPRESSORS $44,869 $32,200 Implemented
TT0075 # 06 Y:2011 06 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,146 $5,000 Implemented
TT0075 # 07 Y:2011 07 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,771 $1,152 Implemented
TT0075 # 08 Y:2011 08 2011 ISOLATE HOT OR COLD EQUIPMENT $1,379 $2,500 Implemented
TT0075 # 09 Y:2011 09 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,369 $5,436 Not Implemented
NC0434 # 01 Y:2011 01 2011 RECOVER WASTE HEAT FROM EQUIPMENT $3,138 $2,127 Implemented
NC0434 # 02 Y:2011 02 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,152 $14,895 Implemented
NC0434 # 03 Y:2011 03 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,424 $1,000 Implemented
NC0434 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $142 $100 Implemented
NC0434 # 05 Y:2011 05 2011 REPLACE BOILER $5,957 $26,400 Not Implemented
NC0434 # 06 Y:2011 06 2011 COVER OPEN TANKS $414 $908 Implemented
NC0434 # 07 Y:2011 07 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,609 $32,453 Implemented