IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

15,265

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0427 # 02 Y:2011 02 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $9,712 $42,275 Not Implemented
WV0427 # 03 Y:2011 03 2011 RECOVER WASTE HEAT FROM EQUIPMENT $8,998 $3,390 Not Implemented
WV0427 # 04 Y:2011 04 2011 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $6,867 $637 Implemented
WV0427 # 05 Y:2011 05 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,786 $1,000 Implemented
WV0427 # 06 Y:2011 06 2011 SHADE WINDOWS FROM SUMMER SUN $5,176 $81,597 Implemented
WV0427 # 07 Y:2011 07 2011 INSTALL OCCUPANCY SENSORS $4,250 $1,260 Not Implemented
WV0427 # 08 Y:2011 08 2011 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $4,132 $2,518 Not Implemented
WV0427 # 09 Y:2011 09 2011 MODIFY STARTUP/SHUTDOWN TIMES $3,115 $975 Implemented
WV0427 # 10 Y:2011 10 2011 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $2,890 $258 Implemented
WV0427 # 11 Y:2011 11 2011 DIRECT WASTE GASSES TO BOILER COMBUSTION AIR $2,312 $11,063 Not Implemented
WV0427 # 12 Y:2011 12 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,161 $955 Not Implemented
WV0427 # 13 Y:2011 13 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,509 $5,031 Not Implemented
WV0427 # 14 Y:2011 14 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $472 $564 Not Implemented
UD0837 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,572 $7,595 Not Implemented
UD0837 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,869 $4,935 Not Implemented
UD0837 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,500 $2,916 Not Implemented
UD0837 # 04 Y:2011 04 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $382 $2,281 Not Implemented
UD0837 # 05 Y:2011 05 2011 DEVELOP A REPAIR/REPLACE POLICY $1,689 $3,536 Not Implemented
UD0837 # 06 Y:2011 06 2011 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $234 $25 Not Implemented
UD0837 # 07 Y:2011 07 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,735 $50 Not Implemented
UD0837 # 08 Y:2011 08 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,623 $1,200 Not Implemented
UD0837 # 09 Y:2011 09 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $538 $75 Not Implemented
UD0837 # 10 Y:2011 10 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,017 $500 Not Implemented
UD0837 # 11 Y:2011 11 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $10,692 $25,000 Not Implemented
UD0837 # 12 Y:2011 12 2011 ISOLATE HOT OR COLD EQUIPMENT $2,952 $11,720 Not Implemented