Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
91
matching recommendationsSIC | 35 | Industrial Machinery And Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BS0042 # 05 Y:2014 | 05 | 2014 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,973 | $3,120 | Implemented |
BS0042 # 04 Y:2014 | 04 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,955 | $450 | Implemented |
BS0042 # 03 Y:2014 | 03 | 2014 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $4,279 | $17,525 | Not Implemented |
BS0042 # 02 Y:2014 | 02 | 2014 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $17,441 | $42,000 | Implemented |
BS0042 # 01 Y:2014 | 01 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,472 | $8,031 | Implemented |
BS0025 # 02 Y:2013 | 02 | 2013 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,537 | $6,138 | Not Implemented |
BS0025 # 06 Y:2013 | 06 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $829 | $977 | Not Implemented |
BS0025 # 01 Y:2013 | 01 | 2013 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $6,335 | $1,104 | Not Implemented |
BS0025 # 03 Y:2013 | 03 | 2013 | INSTALL OCCUPANCY SENSORS | $626 | $495 | Not Implemented |
BS0025 # 04 Y:2013 | 04 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $208 | $1,211 | Not Implemented |
BS0025 # 05 Y:2013 | 05 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $444 | $15 | Not Implemented |
OR0543 # 02 Y:2008 | 02 | 2008 | RECOVER WASTE HEAT FROM EQUIPMENT | $61,542 | $40,950 | Implemented |
OR0543 # 13 Y:2008 | 13 | 2008 | UPGRADE CONTROLS ON COMPRESSORS | $7,300 | $5,700 | Implemented |
OR0543 # 11 Y:2008 | 11 | 2008 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $52,540 | $2,200 | Implemented |
OR0543 # 12 Y:2008 | 12 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $46,700 | $46,700 | Implemented |
OR0543 # 09 Y:2008 | 09 | 2008 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $78,900 | $132,800 | Implemented |
OR0543 # 10 Y:2008 | 10 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,500 | $43,600 | Implemented |
OR0543 # 08 Y:2008 | 08 | 2008 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $8,510 | $0 | Implemented |
OR0543 # 05 Y:2008 | 05 | 2008 | INSTALL OCCUPANCY SENSORS | $19,521 | $31,119 | Implemented |
OR0543 # 06 Y:2008 | 06 | 2008 | OPTIMIZE PLANT POWER FACTOR | $10,290 | $54,000 | Implemented |
OR0543 # 07 Y:2008 | 07 | 2008 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $42,310 | $148,560 | Implemented |
OR0543 # 03 Y:2008 | 03 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $26,017 | $28,000 | Not Implemented |
OR0543 # 04 Y:2008 | 04 | 2008 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,107 | $413 | Implemented |
OR0543 # 01 Y:2008 | 01 | 2008 | UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING | $244,531 | $29,019 | Not Implemented |
UW0004 # 01 Y:2007 | 01 | 2007 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $13,962 | $8,762 | Implemented |